Skip to content

Commit 77c2ced

Browse files
committed
handover: reconcile with companion CPIC/genome session handover
Cross-links the parallel V3-identity/genome session (614/615/618, q2/cpic NARS prototype, CYP2D6 falsifier) as the companion half of the arc. Three corrections their handover surfaced: - mint OGIT->codebook is a CROSS-REPO arc (ogar-vocab + contract CODEBOOK + lance-graph-ogar parity together), per ISS-OGAR-GENETICS-MIRROR-PENDING / E-CODEBOOK-MINT-IS-A-CROSS-REPO-ARC — not a local wire. - Canon:Custom flip must be atomic over the COMPLETE V3 set (OSINT+FMA+ CPIC), now unblocked by #618 (I-LEGACY-API-FEATURE-GATED). - Board-hygiene debt logged: #616/#617 shipped without same-commit EPIPHANIES/PR_ARC/LATEST_STATE updates; fold into the next PR alongside the companion's outstanding 614/615/618 rows. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01EYvNjD8M8LMNYbRy3gq2FP
1 parent 973f97a commit 77c2ced

1 file changed

Lines changed: 26 additions & 7 deletions

File tree

.claude/handovers/2026-06-26-ast-address-to-next-session-capstone.md

Lines changed: 26 additions & 7 deletions
Original file line numberDiff line numberDiff line change
@@ -4,6 +4,12 @@
44
> **To:** next session picking up the OGAR-ERP / V3 AST-address arc
55
> **Status of the arc:** CONJECTURE captured + carrier verified; ONE empirical
66
> probe converts it to FINDING. No V3 *migration* was performed this session.
7+
> **Companion handover (READ ALONGSIDE THIS):** the parallel CPIC/genome session
8+
> (session `01TzqvDqbFRzyx17EkLKBoZF`) owns the V3 *identity* + genome-aligned
9+
> track (PRs #614/#615/#618, the `q2/cpic` NARS prototype, the CYP2D6
10+
> activity-score falsifier). This handover owns the *"why" doc* track (#616/#617,
11+
> ruff #29). Two halves of one arc — their CYP2D6 probe and my MedCare probe are
12+
> complementary falsifiers of the SAME genome-/AST-as-address CONJECTURE.
713
814
---
915

@@ -169,13 +175,26 @@ It produces the first real numbers for: (a) bytes-of-(part_of:is_a) vs source LO
169175

170176
1. **Decide:** merge #617 (docs, safe) — or leave for review.
171177
2. **Brick-3 wiring step 1:** merge `claude/serene-mayer-1a09he` (`facet_mint`).
172-
3. **Brick-3 wiring step 2 (highest leverage):** write the OGIT-source→`ogar_codebook`
173-
mint — the input (`vocab/imports/ogit/`) is already in OGAR; this is the step
174-
that first produces real byte-size numbers for the 10× claim.
175-
4. **Decide the open gate:** the "Canon:Custom" classid half-order (operator call;
176-
the importable-stdlib reuse-clustering argues canon-high, but it collides with
177-
the shipped low-half domain routing — not free).
178-
5. **Optional:** verify ruff #29 in CI (needs network + .NET SDK).
178+
3. **Brick-3 wiring step 2 (highest leverage):** mint OGIT-source→`ogar_codebook`.
179+
The input (`OGAR/vocab/imports/ogit/`) is already in OGAR. **CAVEAT (per the
180+
companion handover's `ISS-OGAR-GENETICS-MIRROR-PENDING` +
181+
`E-CODEBOOK-MINT-IS-A-CROSS-REPO-ARC`): this is a CROSS-REPO arc, not a local
182+
wire** — minting a concept moves OGAR `ogar-vocab` + the contract `CODEBOOK`
183+
mirror + lance-graph-ogar `parity::domains_agree` *together*, in one coordinated
184+
change. Don't push a half-mint. It still produces the first real byte-size
185+
numbers for the 10× claim — just plan it as the cross-repo arc.
186+
4. **Decide the open gate:** the "Canon:Custom" classid half-order. **Now
187+
UNBLOCKED** (the full V3 set is minted, #618) but **must be done ONCE,
188+
atomically, over the COMPLETE V3 set** (OSINT+FMA+CPIC) — a half-flipped corpus
189+
mis-routes (`I-LEGACY-API-FEATURE-GATED`). Operator call; reuse-clustering
190+
argues canon-high, but it collides with the shipped low-half domain routing.
191+
5. **Board-hygiene debt (mine — owed):** #616/#617 shipped the knowledge doc +
192+
findings WITHOUT the same-commit board updates the rule requires. Owed:
193+
`EPIPHANIES.md` entry for the three-layer thesis + `PR_ARC_INVENTORY.md` rows
194+
for #616/#617 + a `LATEST_STATE.md` Contract-Inventory line. **Fold into the
195+
next PR** (the companion session also has #614/#615/#618 PR_ARC rows
196+
outstanding — batch them) — do NOT push a standalone board commit to main.
197+
6. **Optional:** verify ruff #29 in CI (needs network + .NET SDK).
179198

180199
---
181200

0 commit comments

Comments
 (0)