Skip to content

Merge pull request #77 from Aidbox/upgrade-pytest-asyncio #145

Merge pull request #77 from Aidbox/upgrade-pytest-asyncio

Merge pull request #77 from Aidbox/upgrade-pytest-asyncio #145

Triggered via push September 1, 2025 05:31
Status Failure
Total duration 1m 32s
Artifacts

build.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.10)
Process completed with exit code 127.
build (3.10)
Process completed with exit code 1.
build (3.12)
Process completed with exit code 127.
build (3.12)
Process completed with exit code 1.
build (3.12)
The strategy configuration was canceled because "build._3_10" failed
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_10" failed