Spec: ../../project-plan/specs/2026-04-27-data-domain-design.md
Plan: ../../project-plan/plans/2026-04-27-data-domain.md
Brief: 02-data-domain.md
| # | Phase | Status |
|---|---|---|
| 00 | Bootstrap | ✅ Done |
| 01 | Permissions YAML + source-gen | ✅ Done |
| 02 | Identity | ✅ Done |
| 03 | Content | ✅ Done |
| 04 | Country | ✅ Done |
| 05 | Community | ✅ Done |
| 06 | Knowledge Maps + City + Notif + Surveys | ✅ Done |
| 07 | Persistence wiring | ✅ Done |
| 08 | Migration | ✅ Done |
| 09 | Seeder | ✅ Done |
| 10 | Architecture tests + ADRs + release | ✅ Done |
| Layer | At start | Current | Target |
|---|---|---|---|
| Domain | 16 | 284 | ~136 |
| Application | 12 | 12 | ~72 |
| Infrastructure | 6 | 30 (+ 1 skipped) | ~46 |
| Architecture | 0 | 12 | ~15 |
| Source generator | 0 | 10 | ~20 |
| Api Integration | 28 | 28 | ~38 |
| Cumulative | 62 (backend) | 376 + 1 skipped | ~327 (backend) |
(Frontend test counts unchanged — sub-project 2 is backend-only.)
- 2026-04-27 — IDD v1.1 review: Brand stays "CCE Knowledge Center" (do NOT rename to "Taqah" despite IDD's DNS hostnames). Treat IDD's listed "port 433" as a typo for 443 (HTTPS). Prod DNS hostnames
taqah-ext/taqah-int/api.taqah/Api.admin-portalbaked into env config in sub-project 8.
data-domain-v0.1.0 annotated tag created 2026-04-28.
Sub-project 2 is complete (11/11 phases). See docs/data-domain-completion.md for the full DoD verification report.