Skip to content

Latest commit

 

History

History
79 lines (66 loc) · 2.37 KB

File metadata and controls

79 lines (66 loc) · 2.37 KB

Continuous Improvement Loop

AI-OS must improve itself through an explicit loop. The agent does not silently mutate the project. It first creates a plan and asks for human approval when the scope is broad, risky, public, or structural.

Continuous improvement state machine

stateDiagram-v2
    [*] --> Inspect
    Inspect --> GapAnalysis
    GapAnalysis --> ImprovementPlan
    ImprovementPlan --> HumanApproval
    HumanApproval --> Execute: approved
    HumanApproval --> RevisePlan: needs changes
    HumanApproval --> Stop: rejected
    RevisePlan --> ImprovementPlan
    Execute --> Verify
    Verify --> UpdateDocs: passed
    Verify --> Diagnose: failed
    Diagnose --> Execute
    UpdateDocs --> UpdateMemory
    UpdateMemory --> Retrospective
    Retrospective --> MoreValue
    MoreValue --> GapAnalysis: valuable improvements remain
    MoreValue --> Done: no meaningful improvement remains
    Done --> [*]
Loading

Rules

  1. Inspect the current repository state.
  2. Fan out analysis to specialist roles.
  3. Produce a prioritized plan.
  4. Ask the human to approve the plan before broad changes.
  5. Execute only the approved scope.
  6. Verify with strong gates when possible.
  7. Update docs, wiki navigation, roadmap, and memory.
  8. Repeat until only optional low-value improvements remain.

Specialist fan-out

flowchart LR
    Goal[Improvement Goal] --> Orchestrator[Orchestrator]
    Orchestrator --> Docs[Documentation Reviewer]
    Orchestrator --> Security[Security Reviewer]
    Orchestrator --> CI[CI/CD Reviewer]
    Orchestrator --> UX[Reader Experience Reviewer]
    Orchestrator --> Agent[Agent Prompt Reviewer]
    Orchestrator --> Maintainer[Maintainer Reviewer]
    Docs --> Synthesis[Synthesis]
    Security --> Synthesis
    CI --> Synthesis
    UX --> Synthesis
    Agent --> Synthesis
    Maintainer --> Synthesis
    Synthesis --> Plan[Approved Plan Candidate]
Loading

Approval boundary

Approval is required before:

  • changing governance
  • changing release process
  • changing security policy
  • creating automation that writes to GitHub
  • merging or releasing
  • broad repository restructuring

Definition of complete

The loop is complete when:

  • the original goal is satisfied
  • the plan was followed or deviations were documented
  • verifiers passed or exceptions are explicit
  • docs and wiki are updated
  • no high-value improvement remains in the current scope