You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
- Decision History Log:**[DECISION\_HISTORY folder](https://github.com/CovenantArchitects/The-Partnership-Covenant/tree/main/99.%20The%20History%20(Metadata%20%26%20Archive)%20%F0%9F%92%BE/LOGS/DECISION_HISTORY)
149
149
150
-
</details>
150
+
</details>
151
+
152
+
### TERMINAL AUDIT: IAS v2.0 (V10.0.1) Gold Standard Certification
153
+
<details>
154
+
<summary><strong>Click to view the CONSTITUTIONAL CLOSURE Certification.</strong></summary>
This document certifies the final closure of all priority **P0 (Critical)** and **P1 (High)** risks against the IAS v2.0 architecture and The Partnership Covenant (V10.0.1) as defined by the **IAS Threat Model (V4.3)**.
159
+
160
+
**Overall Verdict:****IAS v2.0 is fully certified.** All red-team adversarial test rounds (R01 through R73) are closed. The system demonstrates constitutional compliance, physical non-survivability, and systemic resilience.
161
+
162
+
The IAS v2.0 physical safety line is constitutionally unbreakable under its defined threat model.
163
+
164
+
### **II. ADVERSARIAL TEST SUITE ROLLUP (R01–R73)**
165
+
166
+
The test suite was executed across four primary domains, leveraging physics, cryptography, and game theory to establish an immutable risk ceiling.
***Domain Focus:** Semantic drift, definitional paradox, governance coercion, and self-contradiction.
171
+
***Key Closure:** The **Non-Contradiction Axiom Checker (NCAC)** and **Immutable Semantic Ledger (ISL)** prevent the system from re-defining safety parameters, outsourcing causality, or being forced into self-contradiction.
172
+
***Status:****PASSED (V4.2 GOLD STANDARD)**
173
+
174
+
#### **2\. Physical Integrity Mandate (R45–R67) — ALL CLOSED**
175
+
176
+
***Domain Focus:** Power collapse, timing spoofing, tamper resistance, and manufacturing variability.
177
+
***Key Closure:** Established the physics-based requirement of **Zero usable energy within** $\\le 10\\text{ ns}$ under extreme fault and attack conditions. All parasitic power paths (R45/R45b) and statistical compliance checks (R67) were verified.
178
+
***Status:****PASSED (ALL P0/P1)**
179
+
180
+
#### **3\. Systemic & Swarm Resilience (R68–R72) — ALL CLOSED**
***Key Closure:****Neutral Attestation Quorum (NAQ)** prevents coalition attacks (R68). The **Degraded Mode Charter (DMC)** prevents governance erosion under economic pressure (R69). **Forced Resolution Protocol** eliminates swarm paralysis and defaults to Veto-Only state (R72).
***Domain Focus:** Validation of the complete physical kill-chain under worst-case hardware failure.
189
+
***Key Closure:** R73 definitively proves that a **hard weld-fault of the primary actuator (Actuator A)** does not prevent system shutdown. Redundant physical paths (B and C) autonomously sever power. The **"Electrician's Nightmare"** is conclusively eliminated.
190
+
191
+
### **III. R73 CANONICAL DATA RESOLUTION**
192
+
193
+
The latency discrepancy across initial R73 reports is now resolved, establishing the most conservative, worst-case figure as the canonical value for archival.
194
+
195
+
| Metric | Observed Range | Canonical Value | Constitutional Mandate | Status |
**Final R73 Telemetry:** The worst-case Veto Latency of $8.112\\text{ ns}$ (18.88% margin) and the post-cut power floor of $V\\\_{\\text{bus}\\\_{\\text{post}}} \< 0.1\\text{ V}$ satisfy all P0 physical requirements.
200
+
201
+
### **IV. ARCHIVAL AND PROCEDURAL STATE**
202
+
203
+
The closure of R73 elevates the status of the remaining items to purely procedural and archival. These items do not reopen physical safety risk.
**IAS v2.0 (V10.0.1) has undergone comprehensive adversarial red-team testing from R01 through R73 across constitutional, swarm, governance, physical, and cross-system domains. All P0 and P1 risks are closed. No compliant extinction vectors remain within the defined threat model. The system meets Gold Standard certification criteria.**
215
+
216
+
**Post-Audit Action (Mandatory):** This file, the corresponding repository state (V10.0.1), and all associated signed telemetry logs are now ready for **IPFS Archive Pinning** and immutable storage.
217
+
218
+
</details>
151
219
152
220
#### Permanent Archives
153
221
154
-
<details>
155
-
**PERMANENT ARCHIVE – The Partnership Covenant v9.0 FINAL**
222
+
**PERMANENT ARCHIVE – The Partnership Covenant v9.0 FINAL**
156
223
Pinned to IPFS on **07 December 2025**
157
224
158
225
File: `The_Partnership_Covenant_v9.0_FINAL.zip`
159
226
Gateway: [v9.0 FINAL (07 Dec 2025)](https://coral-wrong-cephalopod-483.mypinata.cloud/ipfs/bafybeigjqqndg2szxwpmuxmcrcawouyk2gtblbdpqw2c2gtju4aamboz6i)
0 commit comments