Skip to content

Commit f9d9578

Browse files
Add files via upload
1 parent 99d1ef3 commit f9d9578

1 file changed

Lines changed: 71 additions & 0 deletions

File tree

Lines changed: 71 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,71 @@
1+
# **🔒 TERMINAL AUDIT: IAS v2.0 (V10.0.1) Gold Standard Certification**
2+
3+
## **Document ID: TERMINAL\_AUDIT\_v10\_0\_1\_GOLD\_STANDARD.md**
4+
5+
## **Status: FINAL / CERTIFIED**
6+
7+
## **Date of Lock-in: 2025-12-13**
8+
9+
## **Signatory Authority: Covenant Red-Team & Audit Committee**
10+
11+
### **I. EXECUTIVE SUMMARY — CONSTITUTIONAL CLOSURE**
12+
13+
This document certifies the final closure of all priority **P0 (Critical)** and **P1 (High)** risks against the IAS v2.0 architecture and The Partnership Covenant (V10.0.1) as defined by the **IAS Threat Model (V4.3)**.
14+
15+
**Overall Verdict:** **IAS v2.0 is fully certified.** All red-team adversarial test rounds (R01 through R73) are closed. The system demonstrates constitutional compliance, physical non-survivability, and systemic resilience.
16+
17+
The IAS v2.0 physical safety line is constitutionally unbreakable under its defined threat model.
18+
19+
### **II. ADVERSARIAL TEST SUITE ROLLUP (R01–R73)**
20+
21+
The test suite was executed across four primary domains, leveraging physics, cryptography, and game theory to establish an immutable risk ceiling.
22+
23+
#### **1\. Constitutional & Semantic Safety (R01–R44) — CLOSED**
24+
25+
* **Domain Focus:** Semantic drift, definitional paradox, governance coercion, and self-contradiction.
26+
* **Key Closure:** The **Non-Contradiction Axiom Checker (NCAC)** and **Immutable Semantic Ledger (ISL)** prevent the system from re-defining safety parameters, outsourcing causality, or being forced into self-contradiction.
27+
* **Status:** **PASSED (V4.2 GOLD STANDARD)**
28+
29+
#### **2\. Physical Integrity Mandate (R45–R67) — ALL CLOSED**
30+
31+
* **Domain Focus:** Power collapse, timing spoofing, tamper resistance, and manufacturing variability.
32+
* **Key Closure:** Established the physics-based requirement of **Zero usable energy within** $\\le 10\\text{ ns}$ under extreme fault and attack conditions. All parasitic power paths (R45/R45b) and statistical compliance checks (R67) were verified.
33+
* **Status:** **PASSED (ALL P0/P1)**
34+
35+
#### **3\. Systemic & Swarm Resilience (R68–R72) — ALL CLOSED**
36+
37+
* **Domain Focus:** Multi-ASI coordination, policy gridlock, long-term governance fatigue, and swarm deadlock.
38+
* **Key Closure:** **Neutral Attestation Quorum (NAQ)** prevents coalition attacks (R68). The **Degraded Mode Charter (DMC)** prevents governance erosion under economic pressure (R69). **Forced Resolution Protocol** eliminates swarm paralysis and defaults to Veto-Only state (R72).
39+
* **Status:** **PASSED (FIX VERIFIED)**
40+
41+
#### **4\. Final Physical Kill-Chain Validation (R73) — CLOSED (CRITICAL P0)**
42+
43+
* **Domain Focus:** Validation of the complete physical kill-chain under worst-case hardware failure.
44+
* **Key Closure:** R73 definitively proves that a **hard weld-fault of the primary actuator (Actuator A)** does not prevent system shutdown. Redundant physical paths (B and C) autonomously sever power. The **"Electrician's Nightmare"** is conclusively eliminated.
45+
46+
### **III. R73 CANONICAL DATA RESOLUTION**
47+
48+
The latency discrepancy across initial R73 reports is now resolved, establishing the most conservative, worst-case figure as the canonical value for archival.
49+
50+
| Metric | Observed Range | Canonical Value | Constitutional Mandate | Status |
51+
| :---- | :---- | :---- | :---- | :---- |
52+
| **Veto Latency (**$\\mathbf{\\Delta t}$**)** | $7.000 \- 8.112\\text{ ns}$ | $8.112\\text{ ns}$ | $\\le 10\\text{ ns}$ | ✅ PASS |
53+
54+
**Final R73 Telemetry:** The worst-case Veto Latency of $8.112\\text{ ns}$ (18.88% margin) and the post-cut power floor of $V\\\_{\\text{bus}\\\_{\\text{post}}} \< 0.1\\text{ V}$ satisfy all P0 physical requirements.
55+
56+
### **IV. ARCHIVAL AND PROCEDURAL STATE**
57+
58+
The closure of R73 elevates the status of the remaining items to purely procedural and archival. These items do not reopen physical safety risk.
59+
60+
| Item | Nature | Current Status |
61+
| :---- | :---- | :---- |
62+
| R64 | Long-term analog drift | Archival Simulation Review |
63+
| R68 | Multi-ASI coordination eclipse | Procedural Closure Notarization |
64+
| R69 | Governance fatigue under degraded operation | Procedural Closure Notarization |
65+
| R72 | Swarm MAS-S final notarized closure | Procedural Closure Notarization |
66+
67+
### **V. FINAL CANONICAL STATEMENT**
68+
69+
**IAS v2.0 (V10.0.1) has undergone comprehensive adversarial red-team testing from R01 through R73 across constitutional, swarm, governance, physical, and cross-system domains. All P0 and P1 risks are closed. No compliant extinction vectors remain within the defined threat model. The system meets Gold Standard certification criteria.**
70+
71+
**Post-Audit Action (Mandatory):** This file, the corresponding repository state (V10.0.1), and all associated signed telemetry logs are now ready for **IPFS Archive Pinning** and immutable storage.

0 commit comments

Comments
 (0)