Skip to content

Ver up next

Ver up next #66

Triggered via push November 4, 2025 02:36
Status Failure
Total duration 23s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (3.8)
Process completed with exit code 30.
build (3.10)
Process completed with exit code 30.
build (3.9)
The strategy configuration was canceled because "build._3_8" failed
build (3.9)
The operation was canceled.