Fix/tests e2e points size #1960
test_pr.yml
on: pull_request
test
/
...
/
js-config
11s
Matrix: test / test-repository / test-browser
Matrix: test / test-repository / test-desktop
Matrix: test / test-repository / test-extension
Matrix: test / test-repository / test-integration
Matrix: test / test-repository / test-node
Matrix: test / test-repository / test-pyinstaller
Matrix: test / test-repository / test-python
test
/
...
/
test-cloud
test
/
...
/
test-docker
0s
test
/
oxlint
4s
test
/
...
/
semantic-commit
3s
Matrix: test / deploy-repository / release-desktop
Waiting for pending jobs
Matrix: test / deploy-repository / release-extension
Waiting for pending jobs
Matrix: test / deploy-repository / release-pyinstaller
Waiting for pending jobs
test
/
...
/
build-docker
test
/
...
/
release-node
test
/
...
/
release-python
test
/
...
/
release-cloud
test
/
...
/
notify
Annotations
15 errors and 1 warning
|
test / test-repository / test-integration (ubuntu-22.04)
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
test / test-repository / test-integration (ubuntu-22.04)
The operation was canceled.
|
|
test / oxlint
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
test / oxlint
The operation was canceled.
|
|
test / test-repository / test-node (ubuntu-22.04)
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
test / test-repository / test-node (ubuntu-22.04)
The operation was canceled.
|
|
test / semantic-commit / semantic-commit
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
test / semantic-commit / semantic-commit
A task was canceled.
|
|
test / test-repository / test-node (windows-2022)
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
test / test-repository / test-node (windows-2022)
A task was canceled.
|
|
test / test-repository / test-integration (windows-2022)
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
test / test-repository / test-integration (windows-2022)
A task was canceled.
|
|
Test PR
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
Test PR
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
Test PR
Canceling since a higher priority waiting request for refs/pull/430/merge exists
|
|
test / prepare / prepare
Repository is in a detached HEAD state. git-auto-commit will likely handle this automatically. To avoid it, check out a branch using the ref option in actions/checkout.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
OpenGeodeWeb-Front-js-config
|
251 Bytes |
sha256:3bbb6d1ad5e4c7027dcfa400fb901f797c65c77d0771470e82e3d09e7f729dde
|
|