Skip to content

fix(days-view): Update day-item selection logic to include preview range#15418

Merged
simeonoff merged 2 commits intomasterfrom
mpopov/calendar/range-preview-inactive-day
Mar 4, 2025
Merged

fix(days-view): Update day-item selection logic to include preview range#15418
simeonoff merged 2 commits intomasterfrom
mpopov/calendar/range-preview-inactive-day

Conversation

@desig9stein
Copy link
Copy Markdown
Contributor

@desig9stein desig9stein commented Feb 27, 2025

Closes #15416

Additional information (check all that apply):

  • Bug fix
  • New functionality
  • Documentation
  • Demos
  • CI/CD

Checklist:

  • All relevant tags have been applied to this PR
  • This PR includes unit tests covering all the new code (test guidelines)
  • This PR includes API docs for newly added methods/properties (api docs guidelines)
  • This PR includes feature/README.MD updates for the feature docs
  • This PR includes general feature table updates in the root README.MD
  • This PR includes CHANGELOG.MD updates for newly added functionality
  • This PR contains breaking changes
  • This PR includes ng update migrations for the breaking changes (migrations guidelines)
  • This PR includes behavioral changes and the feature specification has been updated with them

@adrianptrv adrianptrv added ✅ status: verified Applies to PRs that have passed manual verification and removed ❌ status: awaiting-test PRs awaiting manual verification labels Feb 27, 2025
@simeonoff simeonoff merged commit 6d264e5 into master Mar 4, 2025
3 checks passed
@simeonoff simeonoff deleted the mpopov/calendar/range-preview-inactive-day branch March 4, 2025 11:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

📆 calendar version: 19.1.x ✅ status: verified Applies to PRs that have passed manual verification

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Calendar: first date color in date range preview doesn't get applied when the range is in the "outside dates"

3 participants