Skip to content

Latest commit

 

History

History
451 lines (355 loc) · 12.4 KB

File metadata and controls

451 lines (355 loc) · 12.4 KB

Video Annotation Viewer v0.7.0 Roadmap

Theme: Professional Polish & Enterprise Features
Status: 📋 PLANNED
Target Date: Q3-Q4 2026
Previous Version: v0.6.0 (JOSS Paper & Public Release - Q2 2026)


🎯 OVERVIEW

v0.7.0 delivers all the professional UI/UX polish, advanced job management, and enterprise features that were deferred from v0.4.0 and v0.6.0. This version transforms the application from "functional" to "professional-grade" with sophisticated configuration tools, batch processing, and production-ready scalability.

Prerequisites:

  • v0.6.0 released and JOSS paper submitted
  • VideoAnnotator v1.4.0 stable and mature
  • Community feedback from v0.6.0 incorporated

📦 FEATURE CATEGORIES

Category 1: Professional UI/UX 🎨

Priority: 🟠 HIGH
Effort: Large (8-10 weeks)

1.1 Landing Page Redesign ✅ (Completed in v0.6.2)

  • Homepage Overhaul — Hero section with feature highlights, status cards, recent jobs
  • Visual Identity — Shared AppLayout with persistent navigation bar, VAV icon
  • Getting Started Page — Dedicated /getting-started with two-workflow guide, demo install, annotation types
  • Navigation Restructure — Flat top-level routes (/jobs, /settings), "Control Panel" → "Jobs"

Completed in: v0.6.2 (March 2026)

1.1b Onboarding & Contextual Help (Follow-up to v0.6.2)

  • Tooltips & Contextual Help

    • Tooltips on navigation items explaining each section
    • Contextual help icons (?) next to complex settings and configuration options
    • Inline explanations for pipeline parameters in the New Job wizard
    • Help popovers on status badges explaining what each status means
  • Onboarding Hints

    • First-visit detection (localStorage flag) with guided highlights
    • Pulsing indicators on key actions for new users (e.g. "Choose Folder", "Install Demos")
    • Dismissible hint banners on each page for first visit
    • "Show me around" tour option accessible from Getting Started page
  • Smart Empty States

    • All empty states link to relevant next action or Getting Started page
    • Contextual suggestions based on what the user has/hasn't configured
    • Progress indicators for onboarding steps (e.g. "2 of 3 setup steps complete")
  • Contextual Documentation Links

    • Deep links from Settings tabs to relevant docs sections
    • "Learn more" links on feature cards
    • Error messages with links to troubleshooting guides

Priority: 🟠 HIGH Estimated Effort: Medium (2-3 weeks)

1.2 Visual Configuration Builder

  • Form-Based Configuration

    • Replace/supplement JSON editor with visual forms
    • Parameter sliders, dropdowns, and toggles
    • Real-time configuration preview
    • Validation and error highlighting inline
  • Pipeline Parameter Grouping

    • Common parameters grouped
    • Pipeline-specific advanced options collapsed
    • Contextual help and tooltips
    • Progressive disclosure
  • Configuration Templates & Presets

    • Built-in presets (fast, balanced, quality)
    • Custom preset creation and management
    • Preset descriptions and use cases
    • Quick preset switching
  • Visual Feedback

    • Live parameter impact preview
    • Estimated processing time indicator
    • Resource requirement warnings
    • Configuration diff viewer

Deferred from: v0.4.0, v0.6.0
Note: v0.5.0 has validation API but still uses JSON editor
Estimated Effort: Large (4-5 weeks)

1.3 User Preference Persistence

  • Save User Preferences

    • Remember last configuration choices
    • Save API URL and token (optional)
    • UI preferences (theme, layout, defaults)
    • Recently used pipelines and presets
  • Configuration Management

    • Export configuration to JSON/YAML
    • Import configuration from file
    • Share configurations via URL
    • Team configuration repository
  • Workspace Sessions

    • Save/restore workspace state
    • Recently viewed jobs
    • Search and filter preferences
    • Layout customization

Deferred from: v0.4.0, v0.6.0
Estimated Effort: Medium (2-3 weeks)

1.4 Full Accessibility Compliance (WCAG 2.1 AA)

  • Complete Audit & Fixes

    • All color contrast issues resolved
    • Full keyboard navigation support
    • Complete ARIA implementation
    • Alt text for all images
  • Advanced Features

    • Keyboard shortcuts for common actions
    • Focus management in complex components
    • Skip links for all navigation
    • Responsive focus indicators
  • Comprehensive Testing

    • Multiple screen reader testing (NVDA, JAWS, VoiceOver)
    • Keyboard-only navigation across all pages
    • Color blindness testing
    • Third-party accessibility audit

Deferred from: v0.4.0, v0.6.0 (basic compliance only)
Priority: 🔴 Critical for full public adoption
Estimated Effort: Medium-Large (3-4 weeks)

1.5 UI/UX Polish

  • Design System

    • Complete design system documentation
    • Component library standardization
    • Spacing and sizing tokens
    • Icon library consolidation
  • Advanced Loading States

    • Skeleton screens everywhere
    • Smooth transitions and animations
    • Progress indicators for long operations
    • Informative loading messages
  • Mobile Optimization

    • Tablet layout optimization
    • Mobile-first design review
    • Touch-friendly controls
    • Responsive tables and charts
  • Micro-Interactions

    • Button hover/active states
    • Form validation feedback
    • Success/error animations
    • Tooltip positioning

Deferred from: v0.4.0, v0.6.0
Estimated Effort: Medium (3-4 weeks)


Category 2: Advanced Job Management 📋

Priority: 🟠 HIGH
Effort: Medium (4-6 weeks)

2.1 Job Deletion Polish

  • Enhanced Deletion UI

    • Improved confirmation dialogs
    • Bulk delete with checkbox selection
    • "Delete All Failed" quick action
    • Undo option (5-second window)
  • Permission Handling

    • Graceful error messages
    • Batch deletion progress
    • Success/error feedback
    • Optimistic UI updates

Deferred from: v0.5.0, v0.6.0
Estimated Effort: Small-Medium (1-2 weeks)

2.2 Advanced Filtering & Search

  • Search Functionality

    • Search by job ID, video filename, pipeline
    • Full-text search in parameters
    • Search history and suggestions
    • Search highlighting
  • Filter System

    • Filter by status, pipeline, date range, user
    • Combined filters (AND/OR logic)
    • Saved filters and presets
    • Share filter URLs
  • Sort Options

    • Multiple sort orders
    • Custom sort persistence
    • Quick sort presets

Deferred from: v0.5.0, v0.6.0
Estimated Effort: Medium (2-3 weeks)

2.3 Job List Enhancements

  • Pagination & Virtualization

    • Virtual scrolling for large lists
    • Configurable page size
    • Jump to page
  • Column Customization

    • Show/hide columns
    • Reorder via drag-and-drop
    • Resizable columns
    • Save preferences
  • Bulk Actions

    • Select all/none/invert
    • Bulk cancel/delete/export
  • Job Comparison

    • Side-by-side parameter comparison
    • Results diff viewer
    • Performance comparison

Deferred from: v0.5.0, v0.6.0
Estimated Effort: Medium (2-3 weeks)


Category 3: Enterprise Features 🏢

Priority: 🟢 MEDIUM
Effort: Large (6-8 weeks)

3.1 Folder/Batch Video Processing

  • Folder Selection

    • "Select Folder" for bulk upload
    • Recursive directory scanning
    • Drag-and-drop folder support
    • File type validation
  • Batch Job Creation

    • Apply same config to multiple videos
    • Per-video parameter overrides
    • Batch naming conventions
    • Estimated total time/cost
  • Batch Management

    • View batch as a group
    • Batch progress indicator
    • Priority-based scheduling
    • Pause/resume/cancel batch
  • Batch Results

    • Aggregate results view
    • Batch export
    • Statistics and summary
    • Failed jobs report with retry

Deferred from: v0.4.0, v0.6.0
Estimated Effort: Large (3-4 weeks)

3.2 Automated Workflows

  • Workflow Templates

    • Pre-defined multi-step workflows
    • Custom workflow builder
    • Conditional steps
  • Scheduled Jobs

    • Cron-like scheduling
    • Watch folder for new videos
    • Auto-retry failed jobs
    • Email notifications
  • Pipeline Chaining

    • Sequential pipeline execution
    • Pass outputs between pipelines
    • Conditional execution
    • Dependencies and ordering

Deferred from: v0.4.0, v0.6.0
Estimated Effort: Large (3-4 weeks)
Dependencies: Requires server-side support

3.3 Multi-User & Collaboration

  • User Management

    • Multiple users with tokens
    • User profiles and preferences
    • Activity tracking
    • Job ownership
  • Shared Workspaces

    • Team/project workspaces
    • Shared configurations
    • Collaborative monitoring
    • Access control
  • Notifications

    • Browser push notifications
    • Email notifications
    • Slack/Discord webhooks
    • Custom notification rules

Deferred from: v0.6.0 (new enterprise need)
Priority: 🟡 Low-Medium
Estimated Effort: Large (4-5 weeks)
Dependencies: Requires server multi-user support


Category 4: Performance & Scale 🚀

Priority: 🟠 HIGH
Effort: Medium (3-4 weeks)

4.1 Frontend Performance

  • Bundle Optimization

    • Code splitting and lazy loading
    • Tree shaking
    • Dynamic imports
    • Vendor bundle optimization
  • Memory Management

    • Fix memory leaks
    • Optimize data structures
    • Clear stale cache
    • Monitor production memory
  • Large Dataset Handling

    • Virtual scrolling
    • Progressive loading
    • Pagination optimization
    • Overlay rendering optimization
  • Perceived Performance

    • Faster initial load (SSR/prerendering)
    • Optimistic UI updates
    • Skeleton screens
    • Instant feedback

Deferred from: v0.4.0, v0.6.0
Estimated Effort: Medium (2-3 weeks)

4.2 Caching & Offline Support

  • Smart Caching

    • Service worker
    • Cache API responses
    • Cache annotation data
    • Invalidation strategy
  • Offline Capabilities

    • View previously loaded annotations
    • Queue job creation when offline
    • Sync when restored
    • Offline indicator

Deferred from: v0.6.0 (new feature)
Priority: 🟢 Low-Medium
Estimated Effort: Medium (2-3 weeks)

4.3 Testing & Quality

  • Increase Test Coverage

    • Target 90%+ coverage
    • Integration tests for all features
    • E2E critical paths
    • Visual regression tests
  • Performance Testing

    • Lighthouse CI
    • Bundle size monitoring
    • Performance budgets
    • Load testing
  • Cross-Browser Testing

    • All major browsers
    • Mobile browsers
    • Automated testing (BrowserStack)
    • Compatibility matrix

Deferred from: v0.4.0, v0.6.0
Estimated Effort: Medium (2-3 weeks, ongoing)


📋 DEVELOPMENT PHASES

Phase 1: UI/UX Foundation (Weeks 1-5)

  • Landing page redesign ✅ Done in v0.6.2
  • Onboarding hints, tooltips & contextual help (new, from v0.6.2 follow-up)
  • Visual config builder MVP
  • User preference persistence
  • Full accessibility compliance

Phase 2: Advanced Job Management (Weeks 6-10)

  • Job deletion polish
  • Advanced filtering & search
  • Job list enhancements
  • Bulk operations

Phase 3: Enterprise Features (Weeks 11-18)

  • Folder/batch processing
  • Automated workflows
  • Multi-user features (if server ready)

Phase 4: Performance & Polish (Weeks 19-22)

  • Performance optimizations
  • Caching & offline support
  • Testing & quality improvements
  • Final polish

🎯 SUCCESS CRITERIA

Must-Have 🔴

  • ✅ Landing page redesigned
  • ✅ Visual configuration builder
  • ✅ Full WCAG 2.1 AA compliance
  • ✅ Advanced filtering working
  • ✅ Batch processing functional

Should-Have 🟠

  • ✅ User preferences persisted
  • ✅ Job deletion polished
  • ✅ Performance optimized
  • ✅ Test coverage >90%

Nice-to-Have 🟢

  • 🔮 Automated workflows
  • 🔮 Multi-user features
  • 🔮 Offline support
  • 🔮 Mobile apps

⏱️ TIMELINE ESTIMATE

  • Development: 22-24 weeks (~5-6 months)
  • Target Release: Q3-Q4 2026 (July-December)

Document Version: 1.0 (Split from original v0.6.0)
Created: 2025-10-30
Last Updated: 2025-10-30
Status: 📋 Planning - Awaits v0.6.0 completion
Next Review: After v0.6.0 release