Skip to content

Commit 8ad0e8c

Browse files
committed
docs(website): update dev blog post multiple aggregators
1 parent 8d002f6 commit 8ad0e8c

1 file changed

Lines changed: 2 additions & 2 deletions

File tree

docs/website/blog/2026-01-06-multiple-aggregators-testing-program.md

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -67,8 +67,8 @@ The rollout plan of the DMQ network is the following:
6767
- [x] Released a [guide](https://mithril.network/doc/manual/operate/run-aggregator-node) for setting up a follower aggregator
6868
- [x] Wait for the DMQ adoption to reach the required threshold until aggregators can produce valid certificates
6969
- [x] 4-6 weeks testing program with selected participants
70-
- [ ] **Distribution [2617](https://github.com/input-output-hk/mithril/releases/tag/2617.0)**: `unstable` on the `pre-release-preview` network (extended testing)
71-
- [ ] 4-6 weeks extended testing program with selected SPOs
70+
- [x] **Distribution [2617](https://github.com/input-output-hk/mithril/releases/tag/2617.0)**: `unstable` on the `pre-release-preview` network (extended testing)
71+
- [x] 4-6 weeks extended testing program with selected SPOs
7272
- [ ] **Distribution +3**: `stable` on the `release-preprod` and `release-mainnet` networks
7373
- [ ] Activation of the feature on the `release-preprod` and `release-mainnet` networks
7474
- [ ] Release of an updated guide for setting up a follower aggregator

0 commit comments

Comments
 (0)