Skip to content

Latest commit

 

History

History
57 lines (36 loc) · 3.08 KB

File metadata and controls

57 lines (36 loc) · 3.08 KB

Project Planning and Technical Documentation

1. Team Members

Roles Name Github Profile
QAE Intern Vasco Sousa Vasco profile
QAE & Supervisor Aires Oliveira Aires profile

2. Tasks List

  • T1: Explore the concepts and fundamentals of non-functional requirements and performance in mobile applications.

  • T2: Hands-on on the internal mobile application project that will serve as a basis for applying the performance testing tool.

  • T3: Identify and document the requirements and features of the performance testing tool by collaborating with a development team of QAEs and Developers.

  • T4: Implement a performance testing task – evaluating one of the metrics identified - that will serve as a Proof of Concept (POC).

  • T5: Implement Database Model to record performance tests results.

  • T6: Iterate on other implementations/metrics gathered and defined in T3 – depending on the results of iteration T4.

  • T7: Produce technical documentation and user guides on the final state of the implemented tool.

  • T8: Analyse the potential of the tool, notably identifying current advantages, improvements recorded in the projects where it was used, and identifying next iterations in the development.

  • T9: Produce Final Report for University.

3. Tasks Planning

Task Fev Mar Abr Mai Jun
T1
T2
T3
T4
T5
T6
T7
T8
T9

Legend:

  • Each "█" symbol represents the time period in which the task is active.
  • Each month is divided into two columns, each representing two weeks.
  • Tasks are scheduled across multiple months.

4. Global Artifacts

Global Artifacts