Skip to content

Refactor AGI pipeline into modular structure and fix CI failures #104

Refactor AGI pipeline into modular structure and fix CI failures

Refactor AGI pipeline into modular structure and fix CI failures #104

Triggered via push February 18, 2026 14:11
Status Failure
Total duration 26s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (3.10)
Process completed with exit code 30.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed
build (3.8)
The strategy configuration was canceled because "build._3_10" failed
build (3.8)
The operation was canceled.