Skip to content

Commit 18d7a0f

Browse files
feat(veridical-week7): Project Veridical Week 7 of 12 — Portability & Optimisation Consolidation Sprint
VRDCL-ESR-007 | ~4,800 words | CONFIDENTIAL — Executive Steering Committee Reporting period: Mar 17–23, 2026 | Status: GREEN — Consolidation Week HEADLINE: Three critical infrastructure milestones completed simultaneously - 3-vendor embedding portability validated (OpenAI ada-002, Cohere embed-v3, Voyage AI v2) — all <0.5% accuracy variance, hot-swap in 14-18 min with 0 dropped queries - Vector quantisation deployed to 100% of Pinecone index — 52% storage cost reduction - Legal domain accuracy tuned from 90.8% to 93.1% (+2.3 pp) — exceeds ≥93% target METRICS (Week 6 → Week 7): - Retrieval accuracy: 92.5% → 93.2% (+0.7 pp, domain tuning) - Query latency P95: 1.21s → 1.18s (-0.03s, stretch target ≤1.20s recaptured) - Token cost/query: $0.024 → $0.023 (-$0.001, routing optimisation) - Document corpus: 1.06M → 1.15M (+90K, 1.2M target on track for Week 8) - Pilot users: 438 → 502 (+64, 500 milestone crossed, 6th dept) - Uptime: 99.96% → 99.99% (zero downtime week) BUDGET: $728K / $1.42M (51.3% at 58.3% schedule), CPI 1.13, SPI 1.06, EAC $1.26M RISKS: REI 0.08 (new programme low), VR-001 recommended for CLOSURE, all risks LOW VISIONARY: Vendor Sovereignty — 3-vendor portability creates 50× first-year ROI on $45K investment; $2-8M enterprise-wide savings via procurement policy change HTML: veridical-week7.html (44 KB, dark theme, zero console errors, 9.3s load) API: 10 endpoints all HTTP 200 (/api/veridical-week7/*, including /vendors, /domains) REGRESSION: All 25 tested endpoint groups continue returning HTTP 200
1 parent 7e89f3c commit 18d7a0f

2 files changed

Lines changed: 1169 additions & 0 deletions

File tree

0 commit comments

Comments
 (0)