Commit 2cc8652
committed
docs(governance): consolidated Decadal Strategic & Technical Plan 2026-2035
Authoritative consolidation of Sentinel v2.4 / Omni-Sentinel Mesh v4.0 / SCP v3.0
program. Every technical claim anchored to a runnable, verified in-repo artifact
(11/11 assurance checks green), with A/B/C/D feasibility tiering and an explicit
integrity statement that ASI containment is control discipline, not a safety proof.
Covers: zero-trust TEE architecture (TDX/SEV-SNP + vTPM PCR_MATCH); confidential
enclave deployment + remote attestation; StaR-MoE (SARA+ACR) routing stabilization;
telemetry attestation + G-SRI; PQC WORM (ML-DSA-65/Dilithium/SPHINCS+ + Kafka/S3
Object Lock); zk systemic-risk proofs (Circom/Groth16 -> zk-STARK migration) +
zk-SNARK/zk-STARK relayer pipelines; OSCAL 1.1.2 + OPA/Rego compliance-as-code with
mappings to EU AI Act/Annex IV, NIST AI RMF, ISO/IEC 42001, Basel III/IV, DORA, NIS2,
GDPR Art.22, MAS/HKMA FEAT, FCA SMCR, ECOA, ICGC/GASO; TLA+ SentinelContainmentProtocol
+ SIP v3.0 invariants; HSM + Terraform multi-region enclaves; GIEN/SIP v3.0 federated
collective defense; security-review patterns (Solidity/OPA/React); 24h monitor +
integrity checks; zkML transition-validity; OmegaActual dead-man's switch; DevSecOps/
GitOps (ArgoCD/Flux); 6-month 2028 G-SIFI pilot; supervisory adoption model; KPIs/KRIs;
phased roadmap through 2035 (consistent with roadmap_2026_2035.yaml); verification ledger.
All cross-referenced artifacts confirmed present; roadmap YAML parses (5 phases + 4 ext).1 parent 0dd1a89 commit 2cc8652
1 file changed
Lines changed: 424 additions & 0 deletions
0 commit comments