Skip to content

Northeastern future tasks as of 12/8/25 #12

Description

@augustposch
  • Simulate more rivers covering the Boston subway system to fully simulate its resilience
  • Hourly hydrologic models to remove the hydrograph assumption
  • Integrate new architectures for AI downscaler
  • Integrate LOCA as reference comparison for downscaling
  • Implement AI emulator for hydrodynamic model (adapting Taysi et al. 2024)
  • Extend POC to Mystic River to cover MBTA subway
  • Generalize end-to-end process to other cities (downscaling, flood modeling, urban rail network simulation)
  • Automatable data downloads
  • Automatable data processing for simulations
  • Uncertainty quantification

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions