When purchasing building materials using XIT, I often found that it was necessary to exclude the existing local materials (or sometimes I would manually calculate the building materials that would fall when the structure was demolished, or in some other special cases).
The "override" function is very useful. The "need" column also allows for a clear view of the exact quantity of materials required. However, currently, both "total Cost" and "xit" will only export the original quantities.
Would it be better to use the quantity of "Need" here?

When purchasing building materials using XIT, I often found that it was necessary to exclude the existing local materials (or sometimes I would manually calculate the building materials that would fall when the structure was demolished, or in some other special cases).
The "override" function is very useful. The "need" column also allows for a clear view of the exact quantity of materials required. However, currently, both "total Cost" and "xit" will only export the original quantities.
Would it be better to use the quantity of "Need" here?