Skip to content

chore: prepare for v1.0.0 release #9

chore: prepare for v1.0.0 release

chore: prepare for v1.0.0 release #9

Triggered via push June 17, 2025 18:53
Status Failure
Total duration 23s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (3.11)
Process completed with exit code 1.
test (3.12)
Process completed with exit code 1.
test (3.8)
The operation was canceled.
test (3.8)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed