Skip to content

Latest commit

 

History

History
45 lines (38 loc) · 2.51 KB

File metadata and controls

45 lines (38 loc) · 2.51 KB

Phase 6A agy-ct CLI Architecture Audit Snapshot

1. Files Inspected

  • PHASE6A_AGY_CT_AGENTIC_DETERMINISTIC_CLI_HANDBOOK.md

2. Audit Findings

  • Handbook Confirmation: The handbook PHASE6A_AGY_CT_AGENTIC_DETERMINISTIC_CLI_HANDBOOK.md exists and defines the product definition, compatibility strategy, human/AX experience parameters, output modes, command taxonomy, automatic execution workflow steps, caching, output models, and roadmap.
  • Strict Scope Boundaries:
    • No Rust source files were added or modified.
    • No changes were made to Cargo.toml or dependencies.
    • No integration or unit tests were added or modified.
    • No changes were made to the main README.md file.
    • No image assets or repository assets were added or modified.
    • No modifications to GitHub workflow files were introduced.
    • No dependency additions were made.
    • No git actions (commits, pushes, pulls, fetches) were performed.
    • No network activity occurred.
  • sparkctl Compatibility: Preserved by design; sparkctl remains the entry point for compatibility integrations, and agy-ct is mapped as a separate, parallel CLI.
  • Phase 6A Scope: Handbook and planning only; no code implementation is approved.
  • Phase 6B Scope: Set to setup the binary base shell and the nested clap command parser tree only.
  • Evaluation Dependencies: Libraries such as dag_exec, asupersync, wasm_sandbox, wasmtime, tokio, and ratatui are strictly classified as future/evaluate-only options.

3. Claim Hygiene Result

Wording guidelines are followed:

  • No claims of being "fully deterministic" are made.
  • No claims of being "100% safe" are made.
  • No claims of "no risks" are made.
  • No statements claiming "official SPARK compatibility" are present.
  • No EU AI Act compliance claims are made.

4. Safety Boundaries

  • Offline behavior was deterministic in the validated test scope.
  • Configured leak checks passed in the validated scope.

5. Known Limitations

  • GitHub Actions status is verified through GitHub UI outside this local rollup.
  • handoff-check is local repository readiness only and does not verify remote CI.
  • No official SPARK compatibility claim is made.
  • No compliance claim is made.

6. Risks

  • No blocking risks found in the validated scope.

7. Next Recommended Phase

  • Commit Phase 6A architecture handbook and audit snapshot only after approval.