I faced an issue while running the model with the KN2045_Bal_v4 scenario at a 3-hour time resolution. In the output for both 2040 and 2045, the result shows a total installed capacity of over 250 GW for H₂/gas-fueled generators in 2040 and 2045, despite these generators contributing only a small share of total energy generation.
I would appreciate any guidance on whether:
-
this is a known behavior in this scenario/resolution combination,
-
there are parameter settings or constraints I should review (e.g., availability, fuel cost, or emission limits),
-
or if this could stem from input assumptions in the scenario itself.
Thanks!
I faced an issue while running the model with the KN2045_Bal_v4 scenario at a 3-hour time resolution. In the output for both 2040 and 2045, the result shows a total installed capacity of over 250 GW for H₂/gas-fueled generators in 2040 and 2045, despite these generators contributing only a small share of total energy generation.
I would appreciate any guidance on whether:
this is a known behavior in this scenario/resolution combination,
there are parameter settings or constraints I should review (e.g., availability, fuel cost, or emission limits),
or if this could stem from input assumptions in the scenario itself.
Thanks!