You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: inputs/manual_input.csv
+17-17Lines changed: 17 additions & 17 deletions
Original file line number
Diff line number
Diff line change
@@ -185,14 +185,14 @@ Ammonia cracker,FOM,2050,4.3,%/year,2015,"Ishimoto et al. (2020): 10.1016/j.ijhy
185
185
Ammonia cracker,ammonia-input,0,1.46,MWh_NH3/MWh_H2,,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).
186
186
methanol-to-olefins/aromatics,investment,2015,2628000,EUR/(t_HVC/h),2015,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), Table 35",Assuming CAPEX of 1200 €/t actually given in €/(t/a).
187
187
methanol-to-olefins/aromatics,lifetime,2015,30,years,-,Guesstimate,same as steam cracker
188
-
methanol-to-olefins/aromatics,FOM,2015,3,%/year,-,Guesstimate,same as steam cracker
188
+
methanol-to-olefins/aromatics,FOM,2015,3,%/year,2015,Guesstimate,same as steam cracker
189
189
methanol-to-olefins/aromatics,VOM,2015,30,€/t_HVC,2015,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), Table 35",
190
190
methanol-to-olefins/aromatics,electricity-input,2015,1.3889,MWh_el/t_HVC,-,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), page 69",5 GJ/t_HVC
191
191
methanol-to-olefins/aromatics,methanol-input,2015,18.03,MWh_MeOH/t_HVC,-,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), Sections 4.5 (for ethylene and propylene) and 4.6 (for BTX)","Weighted average: 2.83 t_MeOH/t_ethylene+propylene for 21.7 Mt of ethylene and 17 Mt of propylene, 4.2 t_MeOH/t_BTX for 15.7 Mt of BTX. Assuming 5.54 MWh_MeOH/t_MeOH. "
192
192
methanol-to-olefins/aromatics,carbondioxide-output,2015,0.6107,t_CO2/t_HVC,-,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), Sections 4.5 (for ethylene and propylene) and 4.6 (for BTX)","Weighted average: 0.4 t_MeOH/t_ethylene+propylene for 21.7 Mt of ethylene and 17 Mt of propylene, 1.13 t_CO2/t_BTX for 15.7 Mt of BTX. The report also references process emissions of 0.55 t_MeOH/t_ethylene+propylene elsewhere. "
193
193
electric steam cracker,investment,2015,10512000,EUR/(t_HVC/h),2015,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), Table 35",Assuming CAPEX of 1200 €/t actually given in €/(t/a).
194
194
electric steam cracker,lifetime,2015,30,years,-,Guesstimate,
195
-
electric steam cracker,FOM,2015,3,%/year,-,Guesstimate,
195
+
electric steam cracker,FOM,2015,3,%/year,2015,Guesstimate,
196
196
electric steam cracker,VOM,2015,180,€/t_HVC,2015,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), Table 35",
197
197
electric steam cracker,naphtha-input,2015,14.8,MWh_naphtha/t_HVC,-,"Lechtenböhmer et al. (2016): 10.1016/j.energy.2016.07.110, Section 4.3, page 6.",
198
198
electric steam cracker,electricity-input,2015,2.7,MWh_el/t_HVC,-,"Lechtenböhmer et al. (2016): 10.1016/j.energy.2016.07.110, Section 4.3, page 6.",Assuming electrified processing.
@@ -258,10 +258,10 @@ csp-tower,investment,2020,159.96,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.n
258
258
csp-tower,investment,2030,108.37,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
259
259
csp-tower,investment,2040,99.97,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
260
260
csp-tower,investment,2050,99.38,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
261
-
csp-tower,FOM,2020,1,%/year,1,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
262
-
csp-tower,FOM,2030,1.1,%/year,1.1,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
263
-
csp-tower,FOM,2040,1.3,%/year,1.3,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
264
-
csp-tower,FOM,2050,1.4,%/year,1.4,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
261
+
csp-tower,FOM,2020,1,%/year,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
262
+
csp-tower,FOM,2030,1.1,%/year,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
263
+
csp-tower,FOM,2040,1.3,%/year,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
264
+
csp-tower,FOM,2050,1.4,%/year,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
265
265
csp-tower,lifetime,2020,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
266
266
csp-tower,lifetime,2030,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
267
267
csp-tower,lifetime,2040,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
@@ -270,10 +270,10 @@ csp-tower TES,investment,2020,21.43,EUR/kWh_th,2020,ATB CSP data (https://atb.nr
270
270
csp-tower TES,investment,2030,14.52,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
271
271
csp-tower TES,investment,2040,13.39,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
272
272
csp-tower TES,investment,2050,13.32,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
@@ -282,10 +282,10 @@ csp-tower power block,investment,2020,1120.57,EUR/kW_e,2020,ATB CSP data (https:
282
282
csp-tower power block,investment,2030,759.17,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
283
283
csp-tower power block,investment,2040,700.34,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
284
284
csp-tower power block,investment,2050,696.2,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
285
-
csp-tower power block,FOM,2020,1,%/year,1,see solar-tower.,-
286
-
csp-tower power block,FOM,2030,1.1,%/year,1.1,see solar-tower.,-
287
-
csp-tower power block,FOM,2040,1.3,%/year,1.3,see solar-tower.,-
288
-
csp-tower power block,FOM,2050,1.4,%/year,1.4,see solar-tower.,-
285
+
csp-tower power block,FOM,2020,1,%/year,2020,see solar-tower.,-
286
+
csp-tower power block,FOM,2030,1.1,%/year,2020,see solar-tower.,-
287
+
csp-tower power block,FOM,2040,1.3,%/year,2020,see solar-tower.,-
288
+
csp-tower power block,FOM,2050,1.4,%/year,2020,see solar-tower.,-
289
289
csp-tower power block,lifetime,2020,30,years,2020,see solar-tower.,-
290
290
csp-tower power block,lifetime,2030,30,years,2020,see solar-tower.,-
291
291
csp-tower power block,lifetime,2040,30,years,2020,see solar-tower.,-
0 commit comments