You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: docs/release_notes.rst
+1Lines changed: 1 addition & 0 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -16,6 +16,7 @@ Upcoming Release
16
16
.. The features listed below are not released yet, but will be part of the next release!
17
17
.. To use the features already you have to use the ``master`` branch.
18
18
19
+
* Add technology data for `CO2 dense phase compression` step for transport in large pipelines (https://github.com/PyPSA/technology-data/pull/273) which is different from the current `CO2 liquefaction` technology parameters that is take for ship transport.
19
20
* Breaking changes:
20
21
- Renamed "electricity grid connection" to "distribution grid reinforcement" and updated description for more clarity on the technology and consistency with the source.
Copy file name to clipboardExpand all lines: inputs/manual_input.csv
+5Lines changed: 5 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -195,6 +195,11 @@ NH3 (l) storage tank incl. liquefaction,lifetime,2020,20,years,2010,"Morgan E. 2
195
195
CO2 storage tank,investment,2050,2430,EUR/t_CO2,2013,"Lauri et al. 2014: doi: 10.1016/j.egypro.2014.11.297, Table 3.","Assuming a 3000m^3 pressurised steel cylinder tanks and a CO2 density of 1100 kg/m^3 (close to triple point at -56.6°C and 5.2 bar with max density of 1200kg/m^3 ). Lauri et al. report costs 3x higher per m^3 for steel tanks, which are consistent with other sources. The numbers reported are in rather difficult to pinpoint as systems can greatly vary."
196
196
CO2 storage tank,FOM,2050,1,%/year,2013,"Lauri et al. 2014: doi: 10.1016/j.egypro.2014.11.297, pg. 2746 .","Assuming a 3000m^3 pressurised steel cylinder tanks and a CO2 density of 1100 kg/m^3 (close to triple point at -56.6°C and 5.2 bar with max density of 1200kg/m^3 ). Lauri et al. report costs 3x higher per m^3 for steel tanks, which are consistent with other sources. The numbers reported are in rather difficult to pinpoint as systems can greatly vary."
197
197
CO2 storage tank,lifetime,2050,25,years,2013,"Lauri et al. 2014: doi: 10.1016/j.egypro.2014.11.297, pg. 2746 .","Assuming a 3000m^3 pressurised steel cylinder tanks and a CO2 density of 1100 kg/m^3 (close to triple point at -56.6°C and 5.2 bar with max density of 1200kg/m^3 ). Lauri et al. report costs 3x higher per m^3 for steel tanks, which are consistent with other sources. The numbers reported are in rather difficult to pinpoint as systems can greatly vary."
198
+
CO2 dense phase compression,investment,2024,33288,EUR/t_CO2/h,2024,"Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf","Conversion: 19 Mio. EUR / (5 Mt/yr) = 19*1e6 EUR / (5*1e6 t * (1/8760) h) = 33 288 EUR/t/h"
199
+
CO2 dense phase compression,FOM,2024,5,%/year,2024,"Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf",
200
+
CO2 dense phase compression,lifetime,2024,25,years,2024,"Guesstimate, based on CH4 liquefaction.",
201
+
CO2 dense phase compression,carbondioxide-input,0,1,t_CO2/t_CO2,-,,
202
+
CO2 dense phase compression,electricity-input,0,0.1051,MWh_el/t_CO2,-,"Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf",
198
203
CO2 liquefaction,investment,2004,12.8928283642224,EUR/t_CO2/h,2004,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Plant capacity of 20 kt CO2 / d and an uptime of 85%. For a high purity, humid, low pressure input stream, includes drying and compression necessary for liquefaction."
199
204
CO2 liquefaction,FOM,2004,5,%/year,2004,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,
200
205
CO2 liquefaction,lifetime,2004,25,years,2004,"Guesstimate, based on CH4 liquefaction.",
Copy file name to clipboardExpand all lines: outputs/US/costs_2020.csv
+5Lines changed: 5 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -134,6 +134,11 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134
134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135
135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136
136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137
+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138
+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139
+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140
+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf," ""Conversion: 19 Mio. EUR / (5 Mt/yr) = 19*1e6 EUR / (5*1e6 t * (1/8760) h) = 33 288 EUR/t/h""",2024.0,,
141
+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137
142
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
138
143
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
139
144
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2025.csv
+5Lines changed: 5 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -134,6 +134,11 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134
134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135
135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136
136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137
+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138
+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139
+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140
+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf," ""Conversion: 19 Mio. EUR / (5 Mt/yr) = 19*1e6 EUR / (5*1e6 t * (1/8760) h) = 33 288 EUR/t/h""",2024.0,,
141
+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137
142
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
138
143
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
139
144
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2030.csv
+5Lines changed: 5 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -134,6 +134,11 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134
134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135
135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136
136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137
+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138
+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139
+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140
+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf," ""Conversion: 19 Mio. EUR / (5 Mt/yr) = 19*1e6 EUR / (5*1e6 t * (1/8760) h) = 33 288 EUR/t/h""",2024.0,,
141
+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137
142
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
138
143
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
139
144
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2035.csv
+5Lines changed: 5 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -134,6 +134,11 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134
134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135
135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136
136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137
+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138
+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139
+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140
+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf," ""Conversion: 19 Mio. EUR / (5 Mt/yr) = 19*1e6 EUR / (5*1e6 t * (1/8760) h) = 33 288 EUR/t/h""",2024.0,,
141
+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137
142
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
138
143
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
139
144
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2040.csv
+5Lines changed: 5 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -134,6 +134,11 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134
134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135
135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136
136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137
+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138
+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139
+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140
+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf," ""Conversion: 19 Mio. EUR / (5 Mt/yr) = 19*1e6 EUR / (5*1e6 t * (1/8760) h) = 33 288 EUR/t/h""",2024.0,,
141
+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137
142
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
138
143
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
139
144
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2045.csv
+5Lines changed: 5 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -134,6 +134,11 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134
134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135
135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136
136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137
+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138
+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139
+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140
+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf," ""Conversion: 19 Mio. EUR / (5 Mt/yr) = 19*1e6 EUR / (5*1e6 t * (1/8760) h) = 33 288 EUR/t/h""",2024.0,,
141
+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137
142
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
138
143
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
139
144
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
0 commit comments