electricity grid connection,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion"
3
+
electricity grid connection,lifetime,2025,40,years,2020,same as 'electricity distribution grid',
4
+
electricity grid connection,FOM,2025,2,%/year,2020,same as 'electricity distribution grid',
2
5
methanation,investment,2020,748,EUR/kW_CH4,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 6: “Reference scenario”.",
3
6
methanation,lifetime,2020,20,years,2017,Guesstimate.,"Based on lifetime for methanolisation, Fischer-Tropsch plants."
4
7
methanation,FOM,2020,3,%/year,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), section 6.2.3.1",
Copy file name to clipboardExpand all lines: outputs/US/costs_2020.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -3946,9 +3946,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
3946
3946
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
3947
3947
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
3948
3948
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
3949
-
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
3950
-
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
3951
-
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
3949
+
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
3950
+
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
3951
+
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
3952
3952
electrobiofuels,C in fuel,0.9245,per unit,Stoichiometric calculation,,,,
3953
3953
electrobiofuels,FOM,2.4,%/year,combination of BtL and electrofuels,,2015.0,,
3954
3954
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2025.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -4032,9 +4032,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
4032
4032
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4033
4033
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
4034
4034
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4035
-
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4036
-
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
4037
-
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4035
+
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
4036
+
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
4037
+
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
4038
4038
electrobiofuels,C in fuel,0.9257,per unit,Stoichiometric calculation,,,,
4039
4039
electrobiofuels,FOM,2.5263,%/year,combination of BtL and electrofuels,,2015.0,,
4040
4040
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2030.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -4188,9 +4188,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
4188
4188
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4189
4189
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
4190
4190
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4191
-
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4192
-
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
4193
-
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4191
+
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
4192
+
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
4193
+
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
4194
4194
electrobiofuels,C in fuel,0.9269,per unit,Stoichiometric calculation,,,,
4195
4195
electrobiofuels,FOM,2.6667,%/year,combination of BtL and electrofuels,,2015.0,,
4196
4196
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2035.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
4212
4212
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4213
4213
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
4214
4214
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4215
-
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4216
-
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
4217
-
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4215
+
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
4216
+
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
4217
+
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
4218
4218
electrobiofuels,C in fuel,0.9281,per unit,Stoichiometric calculation,,,,
4219
4219
electrobiofuels,FOM,2.7484,%/year,combination of BtL and electrofuels,,2015.0,,
4220
4220
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2040.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
4212
4212
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4213
4213
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
4214
4214
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4215
-
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4216
-
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
4217
-
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4215
+
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
4216
+
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
4217
+
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
4218
4218
electrobiofuels,C in fuel,0.9292,per unit,Stoichiometric calculation,,,,
4219
4219
electrobiofuels,FOM,2.8364,%/year,combination of BtL and electrofuels,,2015.0,,
4220
4220
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2045.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
4212
4212
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4213
4213
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
4214
4214
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4215
-
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4216
-
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
4217
-
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4215
+
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
4216
+
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
4217
+
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
4218
4218
electrobiofuels,C in fuel,0.9304,per unit,Stoichiometric calculation,,,,
4219
4219
electrobiofuels,FOM,2.9164,%/year,combination of BtL and electrofuels,,2015.0,,
4220
4220
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Copy file name to clipboardExpand all lines: outputs/US/costs_2050.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
4212
4212
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4213
4213
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,,
4214
4214
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4215
-
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,,
4216
-
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,,
4217
-
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,,
4215
+
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,,
4216
+
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,,
4217
+
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,,
4218
4218
electrobiofuels,C in fuel,0.9316,per unit,Stoichiometric calculation,,,,
4219
4219
electrobiofuels,FOM,3.0,%/year,combination of BtL and electrofuels,,2015.0,,
4220
4220
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,,
Copy file name to clipboardExpand all lines: outputs/costs_2020.csv
+3-3Lines changed: 3 additions & 3 deletions
Original file line number
Diff line number
Diff line change
@@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a
975
975
electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
976
976
electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0
977
977
electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
978
-
electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0
979
-
electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0
980
-
electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0
978
+
electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0
979
+
electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0
980
+
electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0
981
981
electrobiofuels,C in fuel,0.9245,per unit,Stoichiometric calculation,,
982
982
electrobiofuels,FOM,2.4,%/year,combination of BtL and electrofuels,,2015.0
983
983
electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,