ensure backward compatibility by preserving technology data
1 parent f80d2ea commit 92127f4

16 files changed

Lines changed: 166 additions & 76 deletions

docs/release_notes.rst

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -16,7 +16,7 @@ Upcoming Release
1616
.. The features listed below are not released yet, but will be part of the next release!
1717
.. To use the features already you have to use the ``master`` branch.
1818
19-
* Update technology data for `CO2 liquefaction`, i.e. the dense-phase carbon dioxide compression/liquefaction step for transport in large pipelines. (https://github.com/PyPSA/technology-data/pull/273)
19+
* Add technology data for `CO2 dense phase compression` step for transport in large pipelines (https://github.com/PyPSA/technology-data/pull/273) which is different from the current `CO2 liquefaction` technology parameters that is take for ship transport.
2020

2121
* Add missing discount rate for OCGT in US-specific data. (https://github.com/PyPSA/technology-data/pull/269)
2222

inputs/manual_input.csv

Lines changed: 11 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -192,11 +192,17 @@ NH3 (l) storage tank incl. liquefaction,lifetime,2020,20,years,2010,"Morgan E. 2
192192
CO2 storage tank,investment,2050,2430,EUR/t_CO2,2013,"Lauri et al. 2014: doi: 10.1016/j.egypro.2014.11.297, Table 3.","Assuming a 3000m^3 pressurised steel cylinder tanks and a CO2 density of 1100 kg/m^3 (close to triple point at -56.6°C and 5.2 bar with max density of 1200kg/m^3 ). Lauri et al. report costs 3x higher per m^3 for steel tanks, which are consistent with other sources. The numbers reported are in rather difficult to pinpoint as systems can greatly vary."
193193
CO2 storage tank,FOM,2050,1,%/year,2013,"Lauri et al. 2014: doi: 10.1016/j.egypro.2014.11.297, pg. 2746 .","Assuming a 3000m^3 pressurised steel cylinder tanks and a CO2 density of 1100 kg/m^3 (close to triple point at -56.6°C and 5.2 bar with max density of 1200kg/m^3 ). Lauri et al. report costs 3x higher per m^3 for steel tanks, which are consistent with other sources. The numbers reported are in rather difficult to pinpoint as systems can greatly vary."
194194
CO2 storage tank,lifetime,2050,25,years,2013,"Lauri et al. 2014: doi: 10.1016/j.egypro.2014.11.297, pg. 2746 .","Assuming a 3000m^3 pressurised steel cylinder tanks and a CO2 density of 1100 kg/m^3 (close to triple point at -56.6°C and 5.2 bar with max density of 1200kg/m^3 ). Lauri et al. report costs 3x higher per m^3 for steel tanks, which are consistent with other sources. The numbers reported are in rather difficult to pinpoint as systems can greatly vary."
195-
CO2 liquefaction,investment,2024,33288,EUR/t_CO2/h,2024,"Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf",
196-
CO2 liquefaction,FOM,2024,5,%/year,2024,"Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf",
197-
CO2 liquefaction,lifetime,2024,25,years,2024,"Guesstimate, based on CH4 liquefaction.",
198-
CO2 liquefaction,carbondioxide-input,0,1,t_CO2/t_CO2,-,,
199-
CO2 liquefaction,electricity-input,0,0.1051,MWh_el/t_CO2,-,"Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf",
195+
CO2 dense phase compression,investment,2024,33288,EUR/t_CO2/h,2024,"Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf",
196+
CO2 dense phase compression,FOM,2024,5,%/year,2024,"Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf",
197+
CO2 dense phase compression,lifetime,2024,25,years,2024,"Guesstimate, based on CH4 liquefaction.",
198+
CO2 dense phase compression,carbondioxide-input,0,1,t_CO2/t_CO2,-,,
199+
CO2 dense phase compression,electricity-input,0,0.1051,MWh_el/t_CO2,-,"Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf",
200+
CO2 liquefaction,investment,2004,12.8928283642224,EUR/t_CO2/h,2004,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Plant capacity of 20 kt CO2 / d and an uptime of 85%. For a high purity, humid, low pressure input stream, includes drying and compression necessary for liquefaction."
201+
CO2 liquefaction,FOM,2004,5,%/year,2004,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,
202+
CO2 liquefaction,lifetime,2004,25,years,2004,"Guesstimate, based on CH4 liquefaction.",
203+
CO2 liquefaction,carbondioxide-input,0,1,t_CO2/t_CO2,-,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process."
204+
CO2 liquefaction,heat-input,0,0.0067,MWh_th/t_CO2,-,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,For drying purposes.
205+
CO2 liquefaction,electricity-input,0,0.123,MWh_el/t_CO2,-,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,
200206
General liquid hydrocarbon storage (product),investment,2012,160,EUR/m^3,2012,"Stelter and Nishida 2013: https://webstore.iea.org/insights-series-2013-focus-on-energy-security , pg. 8F .",Assumed at the higher end for addon facilities/mid-range for stand-alone facilities. Product storage usually smaller due to higher requirements on safety and different construction method. Reference size used here: 40 000 - 60 000 m^3 .
201207
General liquid hydrocarbon storage (product),FOM,2012,6.25,%/year,2012,"Stelter and Nishida 2013: https://webstore.iea.org/insights-series-2013-focus-on-energy-security , figure 7 and pg. 12 .",Assuming ca. 10 EUR/m^3/a (center value between stand alone and addon facility).
202208
General liquid hydrocarbon storage (product),lifetime,2012,30,years,2012,"Stelter and Nishida 2013: https://webstore.iea.org/insights-series-2013-focus-on-energy-security , pg. 11.",

outputs/US/costs_2020.csv

Lines changed: 11 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -134,11 +134,17 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137-
CO2 liquefaction,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138-
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139-
CO2 liquefaction,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140-
CO2 liquefaction,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
141-
CO2 liquefaction,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
141+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
142+
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
143+
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
144+
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
145+
CO2 liquefaction,heat-input,0.0067,MWh_th/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,For drying purposes.,,,
146+
CO2 liquefaction,investment,21.2764,EUR/t_CO2/h,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Plant capacity of 20 kt CO2 / d and an uptime of 85%. For a high purity, humid, low pressure input stream, includes drying and compression necessary for liquefaction.",2004.0,,
147+
CO2 liquefaction,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2004.0,,
142148
CO2 pipeline,FOM,0.9,%/year,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",,2015.0,,
143149
CO2 pipeline,investment,2671.6062,EUR/(tCO2/h)/km,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",Assuming the 120-500 t CO2/h range that is based on cost of a 12 inch onshore pipeline.,2015.0,,
144150
CO2 pipeline,lifetime,50.0,years,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",,2015.0,,

outputs/US/costs_2025.csv

Lines changed: 11 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -134,11 +134,17 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137-
CO2 liquefaction,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138-
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139-
CO2 liquefaction,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140-
CO2 liquefaction,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
141-
CO2 liquefaction,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
141+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
142+
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
143+
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
144+
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
145+
CO2 liquefaction,heat-input,0.0067,MWh_th/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,For drying purposes.,,,
146+
CO2 liquefaction,investment,21.2764,EUR/t_CO2/h,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Plant capacity of 20 kt CO2 / d and an uptime of 85%. For a high purity, humid, low pressure input stream, includes drying and compression necessary for liquefaction.",2004.0,,
147+
CO2 liquefaction,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2004.0,,
142148
CO2 pipeline,FOM,0.9,%/year,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",,2015.0,,
143149
CO2 pipeline,investment,2671.6062,EUR/(tCO2/h)/km,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",Assuming the 120-500 t CO2/h range that is based on cost of a 12 inch onshore pipeline.,2015.0,,
144150
CO2 pipeline,lifetime,50.0,years,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",,2015.0,,

outputs/US/costs_2030.csv

Lines changed: 11 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -134,11 +134,17 @@ CH4 liquefaction,electricity-input,0.036,MWh_el/MWh_CH4,"Pospíšil et al. (2019
134134
CH4 liquefaction,investment,307.4924,EUR/kW_CH4,"Calculated, based on Lochner and Bothe (2009): https://doi.org/10.1016/j.enpol.2008.12.012 and Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306","based on 265 MUSD-2005/(1 bcm/a), 1 bcm = 10.6 TWh, currency exchange rate: 1.15 USD=1 EUR.",2005.0,,
135135
CH4 liquefaction,lifetime,25.0,years,"Fasihi et al 2017, table 1, https://www.mdpi.com/2071-1050/9/2/306",,2005.0,,
136136
CH4 liquefaction,methane-input,1.0,MWh_CH4/MWh_CH4,"Pospíšil et al. (2019): Energy demand of liquefaction and regasification of natural gas and the potential of LNG for operative thermal energy storage (https://doi.org/10.1016/j.rser.2018.09.027), Table 2 and Table 3. alternative source 2: https://encyclopedia.airliquide.com/methane (accessed 2021-02-10).","For refrigeration cycle, cleaning of gas presumed unnecessary as it should be nearly pure CH4 (=SNG). Assuming energy required is only electricity which is for Table 3 in the source provided with efficiencies of ~50% of LHV, making the numbers consistent with the numbers in Table 2.",,,
137-
CO2 liquefaction,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138-
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139-
CO2 liquefaction,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140-
CO2 liquefaction,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
141-
CO2 liquefaction,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
137+
CO2 dense phase compression,FOM,5.0,%/year,Table 4-11 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
138+
CO2 dense phase compression,carbondioxide-input,1.0,t_CO2/t_CO2,,,,,
139+
CO2 dense phase compression,electricity-input,0.1051,MWh_el/t_CO2,Table 4-10 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,,,
140+
CO2 dense phase compression,investment,34120.2,EUR/t_CO2/h,Table 4-5 + 4-6 operation point 15 AIT Study https://www.ait.ac.at/fileadmin/user_upload/CO2Netz_Bericht_241007.pdf,,2024.0,,
141+
CO2 dense phase compression,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2024.0,,
142+
CO2 liquefaction,FOM,5.0,%/year,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,2004.0,,
143+
CO2 liquefaction,carbondioxide-input,1.0,t_CO2/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Assuming a pure, humid, low-pressure input stream. Neglecting possible gross-effects of CO2 which might be cycled for the cooling process.",,,
144+
CO2 liquefaction,electricity-input,0.123,MWh_el/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,,,,
145+
CO2 liquefaction,heat-input,0.0067,MWh_th/t_CO2,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,For drying purposes.,,,
146+
CO2 liquefaction,investment,21.2764,EUR/t_CO2/h,Mitsubish Heavy Industries Ltd. and IEA (2004): https://ieaghg.org/docs/General_Docs/Reports/PH4-30%20Ship%20Transport.pdf .,"Plant capacity of 20 kt CO2 / d and an uptime of 85%. For a high purity, humid, low pressure input stream, includes drying and compression necessary for liquefaction.",2004.0,,
147+
CO2 liquefaction,lifetime,25.0,years,"Guesstimate, based on CH4 liquefaction.",,2004.0,,
142148
CO2 pipeline,FOM,0.9,%/year,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",,2015.0,,
143149
CO2 pipeline,investment,2671.6062,EUR/(tCO2/h)/km,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",Assuming the 120-500 t CO2/h range that is based on cost of a 12 inch onshore pipeline.,2015.0,,
144150
CO2 pipeline,lifetime,50.0,years,"Danish Energy Agency, Technology Data for Energy Transport (March 2021), Excel datasheet: 121 co2 pipeline.",,2015.0,,