Chapter 05 — Orchestration

Why this chapter

Understand how the Orchestrator governs the entire process: its states, decision logic, delegation model, and failure response. After this chapter you can trace any task step by step from start to completion.

Key Concepts

  • Workflow state — a node in the Orchestrator lifecycle: PLANNING / WAITING_APPROVAL / PLAN_REVIEW / ACTING / REVIEWING / COMPLETE.
  • Gate event — a structured message recording a state transition and decision. Contract: schemas/orchestrator.gate-event.schema.json.
  • Delegation — handing a task to a subagent with an explicit contract and context.
  • Approval gate — a point requiring explicit user confirmation before proceeding.
  • Trace ID — a UUIDv4 generated at task start and propagated to all events and delegations for log correlation.

Lifecycle

stateDiagram-v2
    [*] --> PLANNING
    PLANNING --> WAITING_APPROVAL: plan ready
    WAITING_APPROVAL --> PLAN_REVIEW: user approved
    PLAN_REVIEW --> ACTING: review passed
    PLAN_REVIEW --> WAITING_APPROVAL: REJECTED / stagnation
    PLAN_REVIEW --> PLAN_REVIEW: NEEDS_REVISION (≤max_iterations)
    ACTING --> REVIEWING: phase complete
    REVIEWING --> WAITING_APPROVAL: phase approval
    WAITING_APPROVAL --> ACTING: next phase
    WAITING_APPROVAL --> COMPLETE: all phases done
    ACTING --> WAITING_APPROVAL: HIGH_RISK_APPROVAL_GATE
    COMPLETE --> [*]
Loading

Note: The Orchestrator prompt uses the label PLAN_REVIEW, but in the wire format of schemas/orchestrator.gate-event.schema.json this is serialized as event_type: PHASE_REVIEW_GATE plus iteration_index / max_iterations fields. Do not conflate the "prompt-level state label" with the workflow_state value in the schema.

Gate Event Types

From schemas/orchestrator.gate-event.schema.json:

Event type When
PLAN_GATE Decision to accept a plan for execution.
PREFLECT_GATE Pre-action gate (4 risk classes).
PHASE_REVIEW_GATE Review of a phase result or plan-review iteration.
HIGH_RISK_APPROVAL_GATE A destructive operation requires user approval.
COMPLETION_GATE Final summary.

Gate Event Fields

Every event contains at minimum:

  • event_type — one of the enums above.
  • workflow_state — current state.
  • decisionGO / REPLAN / ABSTAIN / APPROVED / REJECTED / …
  • requires_human_approval — boolean.
  • reason — one sentence.
  • next_action — what happens next.
  • trace_id — UUIDv4 for correlation.
  • iteration_index, max_iterations — for the review loop.

Scenario: Typical End-to-End Task

sequenceDiagram
    participant U as User
    participant O as Orchestrator
    participant P as Planner
    participant Rev as Reviewers
    participant E as Executor
    participant CR as CodeReviewer

    U->>O: task / plan
    O->>O: PLANNING
    alt plan received from Planner
        O->>O: WAITING_APPROVAL
    else vague task
        O->>P: delegate planning
        P-->>O: handoff(plan_path)
        O->>O: WAITING_APPROVAL
    end
    U-->>O: approve plan
    O->>O: PLAN_REVIEW
    par by tier
        O->>Rev: PlanAuditor
        O->>Rev: AssumptionVerifier (MEDIUM/LARGE)
        O->>Rev: ExecutabilityVerifier (LARGE)
    end
    Rev-->>O: verdicts
    alt approved
        O->>O: ACTING
        loop per phase / wave
            O->>E: delegate phase
            E-->>O: execution report
            O->>CR: review phase
            CR-->>O: verdict
            O->>O: REVIEWING → WAITING_APPROVAL
            U-->>O: approve phase
        end
        O->>O: COMPLETE
        O-->>U: completion summary
    else needs revision
        O->>P: REPLAN
        P-->>O: revised plan
    end
Loading

Delegation

The Orchestrator delegates a task to a subagent via a structured payload conforming to schemas/orchestrator.delegation-protocol.schema.json. Minimum fields:

  • target_agent — subagent name.
  • phase_id, phase_title.
  • executor_agent — must match the executor_agent field in the plan phase.
  • scope — task description.
  • inputs — file paths, context.
  • expected_output_schema — which schema the subagent must return.
  • trace_id, iteration_index — propagated through all Planner replan/update payloads and review-loop dispatches to ensure full correlation.

Rule: The Orchestrator delegates only to agents listed in plans/project-context.md. External agents are prohibited.

Approval Gates

Mandatory pause points:

  1. After plan approval — the user explicitly approves the plan before any execution begins.
  2. After each phase review — the CodeReviewer verdict is presented; continuation requires explicit confirmation.
  3. Before completion — final summary before commit/merge.
  4. Before HIGH_RISK operations — destructive actions (delete, drop, force push, …).

Batch approval: for multi-phase plans, approval is requested once per wave, not per phase. Exception — phases with destructive or production operations require per-phase approval for that wave.

PreFlect

Before any action batch the Orchestrator runs PreFlect — checking 4 risk classes from skills/patterns/preflect-core.md:

  1. Scope drift — are we going beyond the current phase scope?
  2. Schema/contract drift — will we violate a contract?
  3. Missing evidence — do we have evidence, or are we guessing?
  4. Safety/destructive — does high-risk authorization need confirmation?

Decision: GO / REPLAN / ABSTAIN. "Silent GO with unresolved risk is a contract violation."

Failure Handling

Every failure receives a failure_classification. The Orchestrator routes automatically (see Chapter 13):

Class Action Limit
transient Retry the same task 3
fixable Retry with a hint 1
needs_replan Route to Planner for targeted phase replan 1
escalate STOP → WAITING_APPROVAL → user 0

Reliability policy (from governance/runtime-policy.json):

  • max_retries_per_phase = 5 cumulative.
  • 3 identical failures in a row → escalate (regardless of class).
  • ≥2 transient failures in one wave → next wave runs at 50% parallelism.

NEEDS_INPUT Routing

When a subagent returns status: NEEDS_INPUT with a clarification_request, the Orchestrator does not treat this as a failure. It follows a separate path:

  1. Extract clarification_request.
  2. Present options to the user via vscode/askQuestions.
  3. Wait for selection.
  4. Retry the subagent task with the user's answer added to context.

See docs/agent-engineering/CLARIFICATION-POLICY.md.

Wave-Aware Execution

If plan phases have a wave field:

  1. Group phases by wave (ascending).
  2. Within a wave, execute independently in parallel (up to max_parallel_agents).
  3. Wave N+1 waits for all phases of wave N to complete.
  4. If any phase in a wave fails — evaluate via failure classification before advancing.

Stopping Rules

These moments are mandatory pauses — they cannot be skipped:

  1. After plan approval.
  2. After each phase review.
  3. After the completion summary.

Violating a stopping rule equals skipping a gate, which is a contract violation.

Observability

On any event the Orchestrator may optionally append an NDJSON line to plans/artifacts/observability/<task-id>.ndjson. See docs/agent-engineering/OBSERVABILITY.md.

trace_id is propagated to all subagent delegations, enabling event correlation across the call graph.

Common Mistakes

  • Treating plan_path as approved. Receiving a plan from Planner is not approval; PLAN_REVIEW triggers are still evaluated.
  • Skipping phase review. CodeReviewer is mandatory on all tiers (including TRIVIAL).
  • Ignoring validated_blocking_issues. Only these block continuation — raw CRITICAL findings do not.
  • Not propagating trace_id. Without it, log correlation is impossible.
  • Forcing continuation after ABSTAIN. ABSTAIN means ABSTAIN. Return to the user.

Exercises

  1. (beginner) Open schemas/orchestrator.gate-event.schema.json and list all valid event_type values.
  2. (beginner) Find the "Stopping Rules" section in Orchestrator.agent.md. How many mandatory pause points are listed?
  3. (intermediate) Open governance/runtime-policy.jsonretry_budgets. What are the limits for transient/fixable/needs_replan/escalate?
  4. (intermediate) In what situation does the Orchestrator invoke vscode/askQuestions without a preceding NEEDS_INPUT from a subagent?
  5. (advanced) A plan has 6 phases: 3 in wave 1, 2 in wave 2, 1 in wave 3. How many approval prompts does the Orchestrator show the user in batch mode?

Review Questions

  1. List the 5 gate event types.
  2. What is a trace ID and why is it needed?
  3. How does the Orchestrator handle NEEDS_INPUT from a subagent?
  4. What is wave-aware execution?
  5. What 3 actions require a mandatory pause?