Incompleteness Signals

Purpose: Define the signals that indicate a plan section is NOT complete. Used by plan-mode (producer) to populate the Phase Requirements table, and by orchestrate (consumer) to verify phase-skip decisions.

A plan section may exist without being complete. Before skipping a phase, the orchestrator checks the corresponding plan section for these 7 incompleteness signals. Any signal present means the phase should run.

Layer 2: This protocol serves as Layer 2 of the phase-skip protection system. See orchestrate.md "Context Assessment: Phase Skip Decision Flow" for the full 3-layer gate model.


Signal Definitions

# Signal What to Look For Example
1 Unchecked research items - [ ] checkboxes in "Research Needed" sections - [ ] Investigate OAuth2 library options
2 TBD values in decision tables Cells containing "TBD" in "Key Decisions" or similar tables `
3 Forward references Deferred work markers using the format ⚠️ Handled during {PHASE_NAME} ⚠️ Handled during PREPARE
4 Unchecked questions - [ ] checkboxes in "Questions to Resolve" sections - [ ] Which caching layer to use?
5 Empty or placeholder sections Template text still present, or sections with no substantive content {Description of architectural approach}
6 Unresolved open questions - [ ] checkboxes in "Open Questions > Require Further Research" - [ ] Performance impact of encryption at rest
7 Research/investigation tasks in implementation plan Go/no-go items, feasibility studies, audit tasks, or items explicitly requiring PREPARE-phase runtime execution - Investigate whether Redis Streams can replace Kafka for our throughput needs

Detection Guidance

  • Signals 1, 4, 6: Search for - [ ] within the relevant section. Checked items (- [x]) are resolved and do not count.
  • Signal 2: Scan table cells for the literal string "TBD" (case-insensitive).
  • Signal 3: Search for the exact prefix ⚠️ Handled during. Informal variants ("deferred to", "will be addressed in") are non-standard but should also raise suspicion.
  • Signal 5: Look for curly-brace placeholders ({...}) or sections containing only headings with no content beneath them.
  • Signal 7: Scan the implementation plan (e.g., "Implementation Sequence", "Code Phase") for tasks that involve research, investigation, feasibility assessment, or go/no-go decisions. These require PREPARE-phase runtime execution even if the plan's Preparation section appears complete. Common indicators: "investigate", "research", "evaluate", "assess feasibility", "determine whether", "audit", "spike".

Usage

In plan-mode (Phase 2 synthesis): Check each phase's plan section for these signals to populate the Phase Requirements table.

In orchestrate (Context Assessment: Phase Skip Decision Flow): The completeness check is Layer 2 of the 3-layer skip protection. Before skipping a phase via an approved plan, verify its plan section passes — all 7 signals absent. Use skip reason "plan_section_complete". (Phases can also be skipped via Layer 3 structured analysis with reason "structured_gate_passed" — see orchestrate.md for the full decision flow.)