Skip to content

Merge remote changes and resolve LICENSE conflict #3

Merge remote changes and resolve LICENSE conflict

Merge remote changes and resolve LICENSE conflict #3

Triggered via push July 10, 2025 16:41
Status Failure
Total duration 20s
Artifacts

ci.yml

on: push
integration
16s
integration
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (3.0)
The process '/opt/hostedtoolcache/Ruby/3.0.7/x64/bin/bundle' failed with exit code 6
test (3.3)
The operation was canceled.
test (3.3)
The strategy configuration was canceled because "test._3_0" failed
test (3.2)
The operation was canceled.
test (3.2)
The strategy configuration was canceled because "test._3_0" failed
test (3.1)
The operation was canceled.
test (3.1)
The strategy configuration was canceled because "test._3_0" failed
integration
Process completed with exit code 1.