Skip to content

Latest commit

 

History

History
59 lines (45 loc) · 2.46 KB

File metadata and controls

59 lines (45 loc) · 2.46 KB

Release Documentation Evidence Bundle (Generated)

Generated: 2026-06-25T08:58:01+00:00 Git commit: 442f5f338b4354ef6e55d97afcd0e391ed26b877 on main Working tree dirty: no

Regenerate: python3 scripts/build_release_docs_evidence_bundle.py

Reproduce Commands

  • python3 scripts/build_release_docs_evidence_bundle.py
  • python3 scripts/validate_docs_consistency.py
  • python3 scripts/report_docs_aging.py

Last Gate Run

  • Overall gate status: pass
  • /Users/teee/dev/teaagent/.venv/bin/python scripts/validate_docs_consistency.pypass (exit 0)
  • /Users/teee/dev/teaagent/.venv/bin/python scripts/report_docs_aging.py --checkpass (exit 0)

Documentation Freshness

  • Current-truth docs scanned: 17
  • Needs attention: 10 (>90 days)
  • Stale by owner surface:
    • architecture: 1
    • cli: 1
    • daily-driver: 1
    • docs: 1
    • governance: 2
    • project: 1
    • release: 1
    • strategy: 1
    • verification: 1

Roadmap Excerpt

  • H0 Claim and risk hygiene: Complete (confidence High, next gate H1)
  • H1 Daily operator loop: Complete (confidence High, next gate H2)
  • H2 Multi-surface continuity: Partially fixed — M2 foundation wired (confidence Medium, next gate WDA-002)
  • H3 Ecosystem trust: Partially fixed — M3 tests pass (confidence Medium, next gate WDC-002)
  • H4 Durable owner/agent operations: Partially fixed — shadow wired (confidence Low, next gate WDA-004)
  • H5 Quality and eval loop: Partially fixed — release gate wired (confidence Low, next gate WDA-005)
  • M0 (1-2 weeks): High (next gate All 3 checks pass: validate_docs_consistency.py, refresh_competitive_docs.py --check, teaagent tool lint --root .)
  • M1 (2-6 weeks): High (next gate CLI/TUI cockpit parity acceptance, run evidence summary acceptance, guided recovery acceptance)
  • M2 (4-10 weeks): High (next gate Long-session context guard acceptance, scope budget acceptance, plan revision acceptance)
  • M3 (8-14 weeks): High (next gate Extension activation explain acceptance, MCP trust onboarding acceptance, subagent review/merge acceptance)

Open Residual Risks

No OPEN rows found in the risk register.

OKF Catalogs

Bundle OKF version Concepts Manifest digest
teaagent-current 0.1 15 6bc5a83b500a8936...
teaagent-reference 0.1 27 27a4e67dbe6acd13...
teaagent-history 0.1 15 45f2bab76514e3f8...