Claim class: Current truth for post-review execution order. Derived from: Work Direction Decomposition and the June 10 System Critical Review Package. Supersedes for execution routing: the June 6 workstream spine is substantially closed; use System Improvement Work Directions (2026-06-06) only for unresolved WS0/WS4/WS5/WS6 items not restated in the June 10 backlog.
Review trigger: P0 item closure, suite tier changes, or roadmap truth fixes. Last reviewed: 2026-06-10 Scheduled anchor:
85109e4(review package commit)
Truth before features. No new H4/H5/H6 capability work until Sprint 1 closes. The import graph, roadmap, and commit log must tell one story before any eval-gate or remote-approval differentiation work begins.
| Sprint | Window | Theme | Exit gate |
|---|---|---|---|
| S1 — Truth pass | 2026-06-10 → 2026-06-17 | Label, validate, tier | WDA-001 + WDB-001 + WDB-003 + WDG-002 merged; roadmap rows honest |
| S2 — Shadow wiring | 2026-06-17 → 2026-07-01 | H4/H5 shadow integration | WDA-002 + WDA-003 merged; zero acceptance regression |
| S3 — Gate enforcement | 2026-07-01 → 2026-07-15 | CI release profile + eval corpus | WDA-004 + WDD-001 merged |
| S4 — Front door | parallel from S2 | General-user simplification | WDC-001 baseline + WDC-002 happy path |
| S5 — Remote + consolidate | after S3 | Remote approval + tree hygiene | WDE-001/002, WDF-001 opportunistic |
| S6 — External validation | after S4 | Positioning proof | WDH-002/003 |
Sprint windows are planning targets, not release commitments. Slip S2 if S1 validators are not green.
WDA-001 (label unwired islands)
└─► WDB-001 (import-graph wiring validator)
└─► WDB-003 (roadmap contradiction fix)
└─► WDG-002 (smoke / acceptance / nightly tiers)
└─► WDG-001 (diagnose SIGXCPU truncation — parallel)
Parallel lane (independent files): WDC-001 stranger-test baseline may start any time after S1 WDA-001 lands (needs honest module labels for concept audit).
| ID | Priority | Size | Plan | Summary |
|---|---|---|---|---|
| WDA-001 | P0 | S | WDA-001-plan | Closed — 13 watch-list modules labeled; roadmap H4–H6 honest |
| WDB-001 | P0 | M | WDB-001-plan | Closed — scripts/validate_wiring.py + CI/docs gate |
| WDB-003 | P0 | S | WDB-003-plan | Closed — roadmap reconciled; horizon/milestone validator |
| WDG-001 | P0 | M | WDG-001-plan | Closed — root-cause note |
| WDG-002 | P0 | M | WDG-002-plan | Closed — run_test_tier.py, markers, CI smoke split |
| Sprint | IDs | Notes |
|---|---|---|
| S2 | WDA-002, WDA-003, WDA-006 | Closed — shadow policy + RBAC enforce; ADR 0029 |
| S3 | WDA-004, WDD-001, WDD-002 | Closed — release eval gate + conversational corpus; eval gate design |
| S3b | WDA-005 | Closed — governance/update_platform.py + prove_update_platform.py |
| S4 | WDC-001, WDC-002, WDC-003, WDC-004 | Closed — stranger baseline, 3-concept path, plain receipts, terminology freeze |
| S5 | WDE-001, WDE-002, WDE-003, WDF-001 | Closed — file:// remote backend, Ed25519 signed queue, WS2 gap tests, ADR 0030 |
| S5 | WDF-002 | Closed — H4/H5 folded to governance/ + consensus/; compat aliases (177 root modules) |
| S6 | WDH-001, WDH-003 | Closed — survey moratorium; when-not-to-use refresh |
| S6 | WDE-001b | Closed — HTTP approval coordination server + client (approval_http_*) |
| S6 partial | WDH-002 | Pilot harness + 3 simulated sessions; non-maintainer recruitment open |
| S3 note | WDD-003 | Closed — competitor absence note |
| Ongoing | WDB-002, WDB-004, WDG-003 | Closed — claim-commit hook, suite freshness, suite-summary.json |
Ticket plans for S2+ items are created when the prior sprint exit gate passes.
- Every unwired
teaagent/*module carriesexperimental — unwiredin docstring and roadmap. -
scripts/validate_wiring.pyfails CI on unlabeled unreachable watch-list modules. -
docs/roadmap-status.mdH2–H6 rows match import-graph reality and milestone table. -
scripts/run_test_tier.pysmoke/acceptance/nightly profiles documented indocs/acceptance.md. - WDG-001 root-cause note exists (suite truncation analysis).
| Document | Role |
|---|---|
| Work Direction Decomposition | Full WD-A … WD-H backlog with acceptance gates |
| Engineering Critique Refresh | ENG-R1/R2 evidence |
| Roadmap Status | Canonical status surface (WDB-003 target) |
| Ticket Execution Plans (daily-driver) | Historical daily-driver closure index |