Skip to content

Latest commit

 

History

History
105 lines (80 loc) · 5.56 KB

File metadata and controls

105 lines (80 loc) · 5.56 KB

Work Direction Execution Index — TeaAgent

2026-06-10

Claim class: Current truth for post-review execution order. Derived from: Work Direction Decomposition and the June 10 System Critical Review Package. Supersedes for execution routing: the June 6 workstream spine is substantially closed; use System Improvement Work Directions (2026-06-06) only for unresolved WS0/WS4/WS5/WS6 items not restated in the June 10 backlog.

Review trigger: P0 item closure, suite tier changes, or roadmap truth fixes. Last reviewed: 2026-06-10 Scheduled anchor: 85109e4 (review package commit)


Executive Rule

Truth before features. No new H4/H5/H6 capability work until Sprint 1 closes. The import graph, roadmap, and commit log must tell one story before any eval-gate or remote-approval differentiation work begins.


Sprint Calendar

Sprint Window Theme Exit gate
S1 — Truth pass 2026-06-10 → 2026-06-17 Label, validate, tier WDA-001 + WDB-001 + WDB-003 + WDG-002 merged; roadmap rows honest
S2 — Shadow wiring 2026-06-17 → 2026-07-01 H4/H5 shadow integration WDA-002 + WDA-003 merged; zero acceptance regression
S3 — Gate enforcement 2026-07-01 → 2026-07-15 CI release profile + eval corpus WDA-004 + WDD-001 merged
S4 — Front door parallel from S2 General-user simplification WDC-001 baseline + WDC-002 happy path
S5 — Remote + consolidate after S3 Remote approval + tree hygiene WDE-001/002, WDF-001 opportunistic
S6 — External validation after S4 Positioning proof WDH-002/003

Sprint windows are planning targets, not release commitments. Slip S2 if S1 validators are not green.


Critical Path (Sprint 1)

WDA-001 (label unwired islands)
  └─► WDB-001 (import-graph wiring validator)
        └─► WDB-003 (roadmap contradiction fix)
              └─► WDG-002 (smoke / acceptance / nightly tiers)
                    └─► WDG-001 (diagnose SIGXCPU truncation — parallel)

Parallel lane (independent files): WDC-001 stranger-test baseline may start any time after S1 WDA-001 lands (needs honest module labels for concept audit).


Ticket Plans — Sprint 1 (P0)

ID Priority Size Plan Summary
WDA-001 P0 S WDA-001-plan Closed — 13 watch-list modules labeled; roadmap H4–H6 honest
WDB-001 P0 M WDB-001-plan Closedscripts/validate_wiring.py + CI/docs gate
WDB-003 P0 S WDB-003-plan Closed — roadmap reconciled; horizon/milestone validator
WDG-001 P0 M WDG-001-plan Closedroot-cause note
WDG-002 P0 M WDG-002-plan Closedrun_test_tier.py, markers, CI smoke split

Backlog Queue (scheduled, not yet ticketed)

Sprint IDs Notes
S2 WDA-002, WDA-003, WDA-006 Closed — shadow policy + RBAC enforce; ADR 0029
S3 WDA-004, WDD-001, WDD-002 Closed — release eval gate + conversational corpus; eval gate design
S3b WDA-005 Closedgovernance/update_platform.py + prove_update_platform.py
S4 WDC-001, WDC-002, WDC-003, WDC-004 Closed — stranger baseline, 3-concept path, plain receipts, terminology freeze
S5 WDE-001, WDE-002, WDE-003, WDF-001 Closedfile:// remote backend, Ed25519 signed queue, WS2 gap tests, ADR 0030
S5 WDF-002 Closed — H4/H5 folded to governance/ + consensus/; compat aliases (177 root modules)
S6 WDH-001, WDH-003 Closed — survey moratorium; when-not-to-use refresh
S6 WDE-001b Closed — HTTP approval coordination server + client (approval_http_*)
S6 partial WDH-002 Pilot harness + 3 simulated sessions; non-maintainer recruitment open
S3 note WDD-003 Closedcompetitor absence note
Ongoing WDB-002, WDB-004, WDG-003 Closed — claim-commit hook, suite freshness, suite-summary.json

Ticket plans for S2+ items are created when the prior sprint exit gate passes.


Definition of Done — Sprint 1

  • Every unwired teaagent/* module carries experimental — unwired in docstring and roadmap.
  • scripts/validate_wiring.py fails CI on unlabeled unreachable watch-list modules.
  • docs/roadmap-status.md H2–H6 rows match import-graph reality and milestone table.
  • scripts/run_test_tier.py smoke/acceptance/nightly profiles documented in docs/acceptance.md.
  • WDG-001 root-cause note exists (suite truncation analysis).

Related Documents

Document Role
Work Direction Decomposition Full WD-A … WD-H backlog with acceptance gates
Engineering Critique Refresh ENG-R1/R2 evidence
Roadmap Status Canonical status surface (WDB-003 target)
Ticket Execution Plans (daily-driver) Historical daily-driver closure index