Skip to content

fix: Return error for invalid PDFs (#277) #706

fix: Return error for invalid PDFs (#277)

fix: Return error for invalid PDFs (#277) #706

Triggered via push June 18, 2025 14:55
Status Failure
Total duration 26m 59s
Artifacts

ci.yaml

on: push
Matrix: test_contract
Matrix: test_integration
Matrix: test_unit
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test_contract (3.10)
Process completed with exit code 2.
test_contract (3.12)
The strategy configuration was canceled because "test_contract._3_10" failed
test_contract (3.9)
The operation was canceled.
test_contract (3.9)
The strategy configuration was canceled because "test_contract._3_10" failed
test_contract (3.11)
The operation was canceled.
test_contract (3.11)
The strategy configuration was canceled because "test_contract._3_10" failed