Skip to content

Migrate advisory todo to v2 #5165

Migrate advisory todo to v2

Migrate advisory todo to v2 #5165

Triggered via pull request July 31, 2025 07:37
Status Failure
Total duration 3m 27s
Artifacts

main.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 2.
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed