Skip to content

Add between operator #5953

Add between operator

Add between operator #5953

Triggered via pull request August 17, 2025 22:09
Status Cancelled
Total duration 7m 14s
Artifacts

python-ci.yml

on: pull_request
Matrix: integration-test
Matrix: lint-and-test
Fit to window
Zoom out
Zoom in

Annotations

16 errors
lint-and-test (3.12)
Process completed with exit code 2.
lint-and-test (3.10)
The operation was canceled.
lint-and-test (3.10)
The strategy configuration was canceled because "lint-and-test._3_12" failed
lint-and-test (3.11)
The operation was canceled.
lint-and-test (3.11)
The strategy configuration was canceled because "lint-and-test._3_12" failed
lint-and-test (3.9)
The operation was canceled.
lint-and-test (3.9)
The strategy configuration was canceled because "lint-and-test._3_12" failed
integration-test (3.10)
The operation was canceled.
integration-test (3.10)
Canceling since a higher priority waiting request for Python CI-refs/pull/2335/merge exists
integration-test (3.9)
The operation was canceled.
integration-test (3.9)
Canceling since a higher priority waiting request for Python CI-refs/pull/2335/merge exists
integration-test (3.12)
The operation was canceled.
integration-test (3.12)
Canceling since a higher priority waiting request for Python CI-refs/pull/2335/merge exists
integration-test (3.11)
The operation was canceled.
integration-test (3.11)
Canceling since a higher priority waiting request for Python CI-refs/pull/2335/merge exists
Python CI
Canceling since a higher priority waiting request for Python CI-refs/pull/2335/merge exists