Skip to content

fix(ci): exclude Http2ProtocolProxyHandlerTest from Bazel (Round 8)

a88cf22
Select commit
Loading
Failed to load commit list.
Sign in for the full log view
Closed

[ISSUE #10383] Align Bazel WORKSPACE dependencies with Maven pom.xml #10385

fix(ci): exclude Http2ProtocolProxyHandlerTest from Bazel (Round 8)
a88cf22
Select commit
Loading
Failed to load commit list.

Annotations

1 warning
misspell-check
succeeded May 27, 2026 in 7s