Skip to content

refactor!: Adapt to apify-client v3 [WIP] #35

refactor!: Adapt to apify-client v3 [WIP]

refactor!: Adapt to apify-client v3 [WIP] #35

Triggered via pull request January 2, 2026 12:45
Status Failure
Total duration 5m 22s
Artifacts

on_pull_request.yaml

on: pull_request
PR title check
5s
PR title check
Doc checks  /  ...  /  Docs check
53s
Doc checks / Doc checks / Docs check
Code checks  /  Actions lint check
30s
Code checks / Actions lint check
Code checks  /  Spell check
7s
Code checks / Spell check
Matrix: Code checks / Lint check / Lint check
Matrix: Code checks / Type check / Type check
Matrix: Tests / Integration tests / Integration tests
Matrix: Tests / Unit tests / Unit tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Code checks / Type check / Type check (3.13)
Process completed with exit code 2.
Code checks / Type check / Type check (3.11)
The strategy configuration was canceled because "code_checks.type_check.type_check._3_13" failed
Code checks / Type check / Type check (3.11)
Process completed with exit code 2.
Code checks / Type check / Type check (3.14)
The strategy configuration was canceled because "code_checks.type_check.type_check._3_13" failed
Code checks / Type check / Type check (3.14)
The operation was canceled.
Code checks / Type check / Type check (3.10)
The strategy configuration was canceled because "code_checks.type_check.type_check._3_13" failed
Code checks / Type check / Type check (3.10)
Process completed with exit code 2.
Code checks / Type check / Type check (3.12)
The strategy configuration was canceled because "code_checks.type_check.type_check._3_13" failed
Code checks / Type check / Type check (3.12)
The operation was canceled.
CI (PR)
Canceling since a higher priority waiting request for integration_tests exists