Skip to content

Latest commit

 

History

History
19 lines (18 loc) · 1.59 KB

File metadata and controls

19 lines (18 loc) · 1.59 KB

Example Output

The resulting table will include costs from all GCE SKUs. SKUs to which CUD or SUD have been applied will show both the credit $ amount and the usage amount offset by the credit. This is the schema of the output table, along with an example value.

Field Name Description Example Value
usage_date Date (Los Angeles Time) in which the usage occurred 2019-07-23
region Location.region in Billing Export schema us-central1
unit Usage.unit in Billing Export schema seconds
project_id Project.id in Billing Export schema committed-use-discount-test2
project_name project.name in Billing Export schema committed-use-discount-test2
sku_id Sku.id in Billing Export schema 2E27-4F75-95CD
sku_description Sku.description in Billing Export system labels N1 Predefined Instance Core running in Americas
machine_spec See Billing Export system labels n1-standard-1
usage_amount Usage.amount in Billing Export schema 184590.0
cost See Billing Export schema 1.620846
CUD_covered_usage Amount of usage covered by CUD; unit is indicated by the unit field. 147668.06959875411
CUD_cost $ amount offset by CUD credits; in the currency of your Billing Account, as indicated by the currency field of your billing export -1.296641
SUD_covered_usage Amount of usage covered by SUD; unit is indicated by the unit field. 14768.276077462948
SUD_cost $ amount offset by SUD credits; in the currency of your Billing Account, as indicated by the currency field of your billing export -0.129677