Skip to content

Commit 984f078

Browse files
committed
docs(ai-team): Sprint 3 planning session
Session: 2026-02-11-sprint3-planning Requested by: Jeffrey T. Fritz Changes: - Logged session to .ai-team/log/2026-02-11-sprint3-planning.md - Merged 3 decisions from inbox into decisions.md - Updated status.md to reflect 48/53 components complete - Sprint 3 scope: DetailsView + PasswordRecovery - Propagated cross-agent updates to all agent history files
1 parent b27e1d7 commit 984f078

10 files changed

Lines changed: 110 additions & 39 deletions

File tree

.ai-team/agents/beast/history.md

Lines changed: 2 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -21,3 +21,5 @@
2121
📌 Team update (2026-02-10): PRs #328 (ASCX CLI) and #309 (VS Snippets) shelved indefinitely — decided by Jeffrey T. Fritz
2222
📌 Team update (2026-02-10): Sprint 1 gate review — ImageMap (#337) APPROVED, PageService (#327) APPROVED, ready to merge — decided by Forge
2323
📌 Team update (2026-02-10): Sprint 2 complete — Localize, MultiView+View, ChangePassword, CreateUserWizard shipped with docs, samples, tests. 709 tests passing. 41/53 components done. — decided by Squad
24+
📌 Team update (2026-02-11): Sprint 3 scope: DetailsView + PasswordRecovery. Chart/Substitution/Xml deferred. 48/53 → target 50/53. — decided by Forge
25+
📌 Team update (2026-02-11): Colossus added as dedicated integration test engineer. Rogue retains bUnit unit tests. — decided by Jeffrey T. Fritz

.ai-team/agents/cyclops/history.md

Lines changed: 2 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -31,3 +31,5 @@
3131
📌 Team update (2026-02-10): Lockout protocol — Cyclops locked out of Calendar and FileUpload revisions — decided by Jeffrey T. Fritz
3232
📌 Team update (2026-02-10): Close PR #333 without merging — all Calendar work already on dev, fixes committed directly to dev — decided by Rogue
3333
📌 Team update (2026-02-10): Sprint 2 complete — Localize, MultiView+View, ChangePassword, CreateUserWizard shipped with docs, samples, tests. 709 tests passing. 41/53 components done. — decided by Squad
34+
📌 Team update (2026-02-11): Sprint 3 scope: DetailsView + PasswordRecovery. Chart/Substitution/Xml deferred. 48/53 → target 50/53. — decided by Forge
35+
📌 Team update (2026-02-11): Colossus added as dedicated integration test engineer. Rogue retains bUnit unit tests. — decided by Jeffrey T. Fritz

.ai-team/agents/forge/history.md

Lines changed: 32 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -49,3 +49,35 @@
4949
📌 Team update (2026-02-10): Lockout protocol — Cyclops locked out of Calendar and FileUpload revisions — decided by Jeffrey T. Fritz
5050
📌 Team update (2026-02-10): Close PR #333 without merging — all Calendar work already on dev, PR branch has 0 unique commits — decided by Rogue
5151
📌 Team update (2026-02-10): Sprint 2 complete — Localize, MultiView+View, ChangePassword, CreateUserWizard shipped with docs, samples, tests. 709 tests passing. 41/53 components done. — decided by Squad
52+
53+
### 2026-02-10 — Sprint 3 Planning & Status Reconciliation
54+
55+
**Status.md was significantly stale:**
56+
- Calendar was merged to dev via commit d33e156 and PR #339 but still marked 🔴 Not Started
57+
- FileUpload was merged via PRs #335 and #338 but still marked 🔴 Not Started
58+
- Summary table said 41/53 (Editor: 20/27) but actual count of ✅ entries in the detailed section was already 23/27 for Editors (now 25/27 with Calendar + FileUpload fixed)
59+
- The 27-count for Editor Controls groups MultiView and View as one logical component despite separate table rows
60+
- Corrected total: 48/53 components complete (91%), 5 remaining
61+
62+
**Sprint 3 scope decision:**
63+
- DetailsView and PasswordRecovery are the two buildable components
64+
- Chart deferred: requires SVG/Canvas rendering engine, no Blazor primitive equivalent
65+
- Substitution deferred: Web Forms output caching has no Blazor architectural equivalent
66+
- Xml deferred: XSLT transforms are a dead-end pattern with near-zero migration demand
67+
- Post-Sprint 3 state: 50/53 (94%), library effectively feature-complete for practical migration
68+
69+
**DetailsView design notes:**
70+
- Must inherit BaseStyledComponent (Web Forms DetailsView → CompositeDataBoundControl → WebControl)
71+
- Renders as `<table>` with one `<tr>` per field (vertical layout vs GridView's horizontal)
72+
- Can reuse existing BoundField, TemplateField, CommandField, HyperLinkField, ButtonField from GridView
73+
- Needs DetailsViewMode enum (ReadOnly=0, Edit=1, Insert=2)
74+
- Needs 8 EventArgs classes for mode changes, CRUD operations
75+
76+
**PasswordRecovery design notes:**
77+
- Must inherit BaseStyledComponent
78+
- 3-step wizard flow: UserName → Question → Success (same pattern as CreateUserWizard's 2-step)
79+
- Can reuse existing LoginControls style sub-components (TitleTextStyle, TextBoxStyle, LabelStyle, etc.)
80+
- Table-based HTML output matching ChangePassword's render pattern
81+
82+
📌 Team update (2026-02-10): Sprint 3 plan ratified — DetailsView + PasswordRecovery. Chart/Substitution/Xml deferred indefinitely with migration docs. 48/53 → target 50/53. — decided by Forge
83+
📌 Team update (2026-02-11): Colossus added as dedicated integration test engineer. Rogue retains bUnit unit tests. — decided by Jeffrey T. Fritz

.ai-team/agents/jubilee/history.md

Lines changed: 2 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -31,3 +31,5 @@
3131
- **Assigned because:** Cyclops (original author) was locked out per reviewer rejection protocol after Forge's gate review flagged this issue.
3232

3333
📌 Team update (2026-02-10): Sprint 2 complete — Localize, MultiView+View, ChangePassword, CreateUserWizard shipped with docs, samples, tests. 709 tests passing. 41/53 components done. — decided by Squad
34+
📌 Team update (2026-02-11): Sprint 3 scope: DetailsView + PasswordRecovery. Chart/Substitution/Xml deferred. 48/53 → target 50/53. — decided by Forge
35+
📌 Team update (2026-02-11): Colossus added as dedicated integration test engineer. Rogue retains bUnit unit tests. — decided by Jeffrey T. Fritz

.ai-team/agents/rogue/history.md

Lines changed: 2 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -17,3 +17,5 @@
1717
📌 Team update (2026-02-10): Sprint 1 gate review — Calendar (#333) REJECTED (assigned Rogue for triage) — decided by Forge
1818
📌 Team update (2026-02-10): Close PR #333 without merging — all Calendar work already on dev, PR branch has 0 unique commits — decided by Rogue
1919
📌 Team update (2026-02-10): Sprint 2 complete — Localize, MultiView+View, ChangePassword, CreateUserWizard shipped with docs, samples, tests. 709 tests passing. 41/53 components done. — decided by Squad
20+
📌 Team update (2026-02-11): Sprint 3 scope: DetailsView + PasswordRecovery. Chart/Substitution/Xml deferred. 48/53 → target 50/53. — decided by Forge
21+
📌 Team update (2026-02-11): Colossus added as dedicated integration test engineer. Rogue retains bUnit unit tests. — decided by Jeffrey T. Fritz

.ai-team/decisions.md

Lines changed: 18 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -93,3 +93,21 @@
9393
**By:** Squad (Forge, Cyclops, Beast, Jubilee, Rogue)
9494
**What:** Localize, MultiView+View, ChangePassword, and CreateUserWizard all shipped with full docs, sample pages, and tests. Build passes with 0 errors, 709 tests. status.md updated to 41/53 components (77%).
9595
**Why:** Sprint 2 milestone — all planned components delivered with docs and samples per team policy.
96+
97+
### Integration test audit — full coverage achieved
98+
99+
**By:** Colossus
100+
**What:** Audited all 74 sample page routes against existing smoke tests. Found 32 pages without smoke tests and added them all as `[InlineData]` entries in `ControlSampleTests.cs`. Added 4 new interaction tests in `InteractiveComponentTests.cs` for Sprint 2 components: MultiView (view switching), ChangePassword (form fields), CreateUserWizard (form fields), Localize (text rendering). Fixed pre-existing Calendar sample page CS1503 errors (bare enum values → fully qualified `CalendarSelectionMode.X`).
101+
**Why:** Every sample page is a promise to developers. The integration test matrix must cover every route to catch rendering regressions. The Calendar fix was required to unblock the build — all 4 errors were in the sample page, not the component.
102+
103+
### 2026-02-10: Sprint 3 Scope and Plan
104+
105+
**By:** Forge
106+
**What:** Sprint 3 scope finalized — DetailsView and PasswordRecovery are the two buildable components. Chart, Substitution, and Xml deferred indefinitely.
107+
**Why:** With 48/53 components complete (91%), we have exactly 5 remaining. Three of them (Chart, Substitution, Xml) are poor candidates: Chart requires an entire charting library, Substitution is a cache-control mechanism that has no Blazor equivalent, and Xml/XSLT transforms are a dead-end technology with near-zero migration demand. DetailsView and PasswordRecovery are the only two that provide real migration value and are feasible to build.
108+
109+
### 2026-02-10: Colossus added — dedicated integration test engineer
110+
111+
**By:** Jeffrey T. Fritz (via Squad)
112+
**What:** Added Colossus as a new team member responsible for Playwright integration tests. Colossus owns `samples/AfterBlazorServerSide.Tests/` and ensures every sample page has a corresponding integration test (smoke, render, and interaction). Rogue retains ownership of bUnit unit tests. Integration testing split from Rogue's QA role.
113+
**Why:** Sprint 2 audit revealed no integration tests existed for any newly shipped components. Having a dedicated agent ensures integration test coverage keeps pace with component development. Every sample page is a promise to developers — Colossus verifies that promise in a real browser.

.ai-team/decisions/inbox/colossus-integration-test-audit.md

Lines changed: 0 additions & 5 deletions
This file was deleted.

.ai-team/decisions/inbox/squad-colossus-added.md

Lines changed: 0 additions & 5 deletions
This file was deleted.
Lines changed: 26 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,26 @@
1+
# SKILL: Status Reconciliation
2+
3+
**Confidence:** low
4+
**Source:** earned
5+
6+
## When to Use
7+
When planning a sprint or auditing project status, and the status tracking document may be stale relative to the actual codebase state.
8+
9+
## Pattern
10+
11+
1. **Read the status document** to understand what it claims.
12+
2. **Verify claims against the filesystem** — check if files marked "Not Started" actually exist on the current branch. Use `glob` to search for `.razor`, `.cs`, or other source files.
13+
3. **Verify claims against git history** — use `git log --oneline -- <path>` to confirm when files were added and which PRs merged them.
14+
4. **Check downstream artifacts** — docs, sample pages, tests, nav entries. A component isn't truly "Complete" without these per team policy.
15+
5. **Reconcile counts** — summary tables often drift from detailed breakdowns. Count the actual ✅ entries and compare to the summary. Fix both to match reality.
16+
6. **Watch for grouping mismatches** — components like MultiView/View may be listed as separate rows but counted as one logical component in totals.
17+
18+
## Common Traps
19+
20+
- **Merge-to-dev without status update:** PRs merge but nobody updates the tracking doc. Always check git log for recent merges.
21+
- **Summary vs detail drift:** Summary table says "20 complete" but counting ✅ rows gives 23. One gets updated, the other doesn't.
22+
- **Section headers vs tables:** A section header says "18/27" but the summary table says "20/27" and the actual count is "23/27". Three numbers, three different values.
23+
- **Stale estimation tables:** Effort estimation sections list items as remaining work that are already complete. These sections are informational but misleading if not updated.
24+
25+
## Output
26+
A corrected status document with consistent counts across summary, detail, and estimation sections.

status.md

Lines changed: 26 additions & 29 deletions
Original file line numberDiff line numberDiff line change
@@ -2,18 +2,18 @@
22

33
| Category | Completed | In Progress | Not Started | Total |
44
|----------|-----------|-------------|-------------|-------|
5-
| Editor Controls | 20 | 0 | 7 | 27 |
5+
| Editor Controls | 25 | 0 | 2 | 27 |
66
| Data Controls | 7 | 0 | 2 | 9 |
77
| Validation Controls | 7 | 0 | 0 | 7 |
88
| Navigation Controls | 3 | 0 | 0 | 3 |
99
| Login Controls | 6 | 0 | 1 | 7 |
10-
| **TOTAL** | **41** | **0** | **12** | **53** |
10+
| **TOTAL** | **48** | **0** | **5** | **53** |
1111

1212
---
1313

1414
## Detailed Component Breakdown
1515

16-
### 🟡 Editor Controls (18/27 - 67% Complete)
16+
### 🟢 Editor Controls (25/27 - 93% Complete)
1717

1818
| Component | Status | Notes |
1919
|-----------|--------|-------|
@@ -31,9 +31,9 @@
3131
| RadioButton | ✅ Complete | Documented, tested, sample page exists |
3232
| TextBox | ✅ Complete | Documented, tested, sample page exists |
3333
| BulletedList | ✅ Complete | Documented, tested (41 tests), sample page exists |
34-
| Calendar | 🔴 Not Started | Complex date picker |
34+
| Calendar | ✅ Complete | Documented, tested, table-based rendering, CalendarSelectionMode enum |
3535
| CheckBoxList | ✅ Complete | Documented, tested (26 tests) |
36-
| FileUpload | 🔴 Not Started | Consider Blazor InputFile |
36+
| FileUpload | ✅ Complete | Documented, tested, uses Blazor InputFile internally |
3737
| ImageMap | ✅ Complete | Documented, tested (23 tests) |
3838
| ListBox | ✅ Complete | Documented, tested, supports single/multi-select |
3939
| Localize | ✅ Complete | Documented, tested, inherits from Literal |
@@ -81,7 +81,7 @@
8181
| SiteMapPath | ✅ Complete | Documented, tested (23 tests), sample page exists |
8282
| TreeView | ✅ Complete | Documented in TreeView.md |
8383

84-
### 🟡 Login Controls (4/7 - 57% Complete)
84+
### 🟢 Login Controls (6/7 - 86% Complete)
8585

8686
| Component | Status | Notes |
8787
|-----------|--------|-------|
@@ -131,25 +131,24 @@
131131
| ~~**Menu**~~ | ~~Medium-High~~ | ~~12-16~~ | ~~6-8~~ | ✅ Complete |
132132
| ~~**SiteMapPath**~~ | ~~Medium~~ | ~~8-10~~ | ~~4-5~~ | ✅ Complete |
133133
| ~~**DataPager**~~ | ~~Medium~~ | ~~8-12~~ | ~~4-6~~ | ✅ Complete |
134-
| **DetailsView** | High | 16-24 | 8-12 |
134+
| ~~**DetailsView**~~ | ~~High~~ | ~~16-24~~ | ~~8-12~~ | Sprint 3 |
135135

136136
#### Login Controls
137137
| Component | Complexity | Est. Hours (Manual) | Est. Hours (with Copilot) |
138138
|-----------|------------|---------------------|---------------------------|
139-
| **ChangePassword** | High | 16-24 | 8-12 |
140-
| **PasswordRecovery** | High | 16-24 | 8-12 |
141-
| **CreateUserWizard** | Very High | 24-32 | 12-16 |
139+
| ~~**ChangePassword**~~ | ~~High~~ | ~~16-24~~ | ~~8-12~~ | ✅ Complete |
140+
| **PasswordRecovery** | High | 16-24 | 8-12 | Sprint 3 |
141+
| ~~**CreateUserWizard**~~ | ~~Very High~~ | ~~24-32~~ | ~~12-16~~ | ✅ Complete |
142142

143143
#### Lower Priority / Consider Deferring
144144
| Component | Complexity | Notes |
145145
|-----------|------------|-------|
146-
| ~~**BulletedList**~~ | ~~Low~~ | ~~Simple HTML list~~ | ✅ Complete |
147-
| **Calendar** | High | Complex date picker |
148-
| **FileUpload** | Medium | Blazor has InputFile |
146+
| ~~**Calendar**~~ | ~~High~~ | ~~Complex date picker~~ | ✅ Complete |
147+
| ~~**FileUpload**~~ | ~~Medium~~ | ~~Blazor has InputFile~~ | ✅ Complete |
149148
| ~~**ImageMap**~~ | ~~Medium~~ | ~~Clickable regions~~ | ✅ Complete |
150-
| **MultiView/View** | Medium | Tab-like container |
149+
| ~~**MultiView/View**~~ | ~~Medium~~ | ~~Tab-like container~~ | ✅ Complete |
151150
| ~~**Table**~~ | ~~Low~~ | ~~HTML table wrapper~~ | ✅ Complete |
152-
| **Localize** | Low | Localization |
151+
| ~~**Localize**~~ | ~~Low~~ | ~~Localization~~ | ✅ Complete |
153152
| **Xml** | Medium | XML transform |
154153
| **Substitution** | N/A | Cache-related, may not apply |
155154
| **Chart** | Very High | Consider external library |
@@ -161,10 +160,10 @@
161160
|--------|-------------------|------------------------|
162161
| ~~**High Priority (4)**~~ | ~~20-30 hours~~ | ~~10-15 hours~~ | ✅ Complete |
163162
| **Medium Priority (3 remaining)** | ~12-20 hours | ~6-10 hours |
164-
| **Nav & Data (3 remaining)** | ~32-46 hours | ~16-23 hours |
165-
| **Login (3)** | ~56-80 hours | ~28-40 hours |
166-
| **Lower Priority (10)** | Variable | Variable |
167-
| **Total Remaining** | 18 components | 18 components |
163+
| **Nav & Data (1 remaining)** | ~16-24 hours | ~8-12 hours |
164+
| **Login (1 remaining)** | ~16-24 hours | ~8-12 hours |
165+
| **Lower Priority (3 remaining)** | Variable | Variable |
166+
| **Total Remaining** | 5 components | 5 components |
168167

169168
---
170169

@@ -196,27 +195,25 @@
196195
3. ~~**RadioButton**~~ - ✅ Complete
197196
4. ~~**DropDownList**~~ - ✅ Complete
198197

199-
### Phase 2: List & Container Controls (Next Priority)
198+
### Phase 2: List & Container Controls ✅ COMPLETE
200199
5. ~~**Panel**~~ - ✅ Complete
201200
6. ~~**PlaceHolder**~~ - ✅ Complete
202201
7. ~~**CheckBoxList**~~ - ✅ Complete (Multi-select)
203202
8. ~~**RadioButtonList**~~ - ✅ Complete (Single-select group, 30 tests)
204203
9. ~~**ListBox**~~ - ✅ Complete
205204

206-
### Phase 3: Navigation & Data
205+
### Phase 3: Navigation & Data ✅ MOSTLY COMPLETE
207206
10. ~~**Menu**~~ - ✅ Complete
208207
11. ~~**SiteMapPath**~~ - ✅ Complete (Breadcrumb navigation, 23 tests)
209208
12. ~~**DataPager**~~ - ✅ Complete (Paging for ListView)
210-
13. **DetailsView** - Single-record display
209+
13. **DetailsView** - Single-record display (Sprint 3)
211210

212-
### Phase 4: Login Controls
213-
14. **ChangePassword** - Password change UI
214-
15. **PasswordRecovery** - Password reset flow
215-
16. **CreateUserWizard** - User registration
211+
### Phase 4: Login Controls ✅ MOSTLY COMPLETE
212+
14. ~~**ChangePassword**~~ - ✅ Complete
213+
15. **PasswordRecovery** - Password reset flow (Sprint 3)
214+
16. ~~**CreateUserWizard**~~ - ✅ Complete
216215

217216
### Consider Deferring
218217
- **Chart** - Very high complexity, consider Blazor charting libraries
219-
- **Calendar** - Complex, many alternatives exist
220-
- **DataGrid** - Legacy, use GridView instead
221218
- **Substitution** - Cache-related, may not apply to Blazor
222-
- **FileUpload** - Blazor has built-in InputFile component
219+
- **Xml** - Low migration demand, XSLT is rarely used in modern apps

0 commit comments

Comments
 (0)