Skip to content

Refactor project_hash calculation #100

Refactor project_hash calculation

Refactor project_hash calculation #100

Triggered via push May 3, 2026 10:01
Status Failure
Total duration 36s
Artifacts

test.yaml

on: push
Matrix: unit
Fit to window
Zoom out
Zoom in

Annotations

5 errors
unit (8.5)
Process completed with exit code 2.
unit (8.4)
The strategy configuration was canceled because "unit._8_5" failed
unit (8.4)
The operation was canceled.
unit (8.3)
The strategy configuration was canceled because "unit._8_5" failed
unit (8.3)
The operation was canceled.