Skip to content

Changing time step in simulate #48

Description

@bleyerj

Hi,
first thank you for the very nice package!
If I understand it correctly, Koopman.simulate simulates the learned model forward in time with the same time interval dt as the one which was used to fit the model, right ? If so, would it be possible to include an option to change the dt for this prediction. For instance, I would like to test the quality of the learning with a small number of snapshots over a given time interval and check against the solution on the intermediate time steps between 2 snapshots used for the training.
Thanks!

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions