You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: docs/safety_mgt/module_safety_analysis_fdr.rst
+4-4Lines changed: 4 additions & 4 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -46,7 +46,7 @@ As described in :need:`wf__p_formal_rv`, the formal document review is performed
46
46
47
47
**Checklist**
48
48
49
-
Please note that it is mandatory to fill in the "passed" column with "yes" or "no" for each checklist item and additional to add in the remarks why it is passed or not passed. In case of "no" an issue link to the issue tracking system has to be added in the last column. See also :ref:`review_concept` for further information about reviews in general and inspection in particular.
49
+
Please note that it is mandatory to fill in the "passed" column with "yes" or "no" for each checklist item and additional to add in the remarks why it is passed or not passed. In case of "no" an issue link to the issue tracking system has to be added in the last column. See also :need:`doc_concept__wp_inspections` for further information about reviews in general and inspection in particular.
50
50
51
51
52
52
.. list-table:: General Checklist
@@ -60,7 +60,7 @@ Please note that it is mandatory to fill in the "passed" column with "yes" or "n
60
60
- Comment
61
61
62
62
* - Gen 1
63
-
- Are the safety analysis performed according to the defined process and templates? See :ref:`process_requirements_safety_analysis` and also :ref:`FMEA_templates` and :ref:`dfa_templates`
63
+
- Are the safety analysis performed according to the defined process and templates? See :need:`gd_req__saf_structure` and also :need:`doc__feature_name_fmea` and :need:`doc__feature_name_dfa`
0 commit comments