Skip to content

chore(deps): update dependency rollup to v4.48.1 (master) #6503

chore(deps): update dependency rollup to v4.48.1 (master)

chore(deps): update dependency rollup to v4.48.1 (master) #6503

Triggered via pull request August 25, 2025 10:27
Status Failure
Total duration 1m 2s
Artifacts

node-ci.yml

on: pull_request
Matrix: verify-matrix
workflow-result
2s
workflow-result
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

10 errors
verify-matrix (23)
Process completed with exit code 1.
verify-matrix (20.6.1)
The operation was canceled.
verify-matrix (20.6.1)
The strategy configuration was canceled because "verify-matrix._23" failed
verify-matrix (22.0.0)
The operation was canceled.
verify-matrix (22.0.0)
The strategy configuration was canceled because "verify-matrix._23" failed
verify-matrix (18.19.0)
The operation was canceled.
verify-matrix (18.19.0)
The strategy configuration was canceled because "verify-matrix._23" failed
verify-matrix (22)
The operation was canceled.
verify-matrix (22)
The strategy configuration was canceled because "verify-matrix._23" failed
workflow-result
Process completed with exit code 1.