docs(dash): coordinated v36-universal migration plan — dual-stack + flag cutover (block-viable gated) - #624

Closed
frstrtr wants to merge 1 commit into
masterfrom
dash/coordinated-migration-plan
Closed

docs(dash): coordinated v36-universal migration plan — dual-stack + flag cutover (block-viable gated)#624
frstrtr wants to merge 1 commit into
masterfrom
dash/coordinated-migration-plan

Conversation

@frstrtr

@frstrtr frstrtr commented Jul 3, 2026

Copy link
Copy Markdown
Owner

DASH lane owed deliverable (operator [s=migration-plan]). Docs-only, SAFE-ADDITIVE, single new file docs/dash/v36-coordinated-migration-plan.md — no coin tree, no consensus, no CI-config.

Block-viable HARD precondition now SATISFIED on master (plan gate items 1-3 all true):

  1. dash(s8): broadcaster_full won-block keystone — dual-arm relay (#83) [fresh base, supersedes #456] #465 broadcaster_full keystone MERGED (35693c5) — won-block dual-arm relay (embedded P2P + dashd submitblock fallback).
  2. G3a POPULATED regtest block proven (diverse tx types, submitblock arm) + G3b populated testnet3 leg proven (block h120 nTx=4, accepted+relayed).
  3. dashd RPC fallback retained on every node — never removed.

Plan substance: DASH runs a coordinated cutover (short dual-stack window -> scheduled flag moment), NOT a slow 1-by-1 ratchet like DGB/BTC/LTC, because the friendly DASH p2pool node set is enumerable + operator-coordinated (operator directive 2026-06-18). Transition 16->36 (older-than-v35 baseline vs oracle frstrtr/p2pool-dash @9a0a609). Preserves the 3-bucket isolation invariant (PREFIX/IDENTIFIER untouched; FLAG6 donation carried; v16 compat temporary, dropped at cutover+grace). Phases M0 enumerate/pin -> M1 dual-stack 72h -> M2 coordinated cutover -> M3 grace + compat drop.

GPG-signed (50AB1379285EFE76). No self-merge: integrator verify -> operator tap.

…dow + flag cutover (NOT ratchet), 5 checks, block-viable gated
@frstrtr

frstrtr commented Jul 3, 2026

Copy link
Copy Markdown
Owner Author

Withdrawing: opened prematurely off the stale Jun-25 public branch (83-line stub). The finalized coordinated-migration plan (341 lines: crossing-floor, #536 threshold-SSOT, work-weighted metric, window-accessor, PPLNS two-function, vardiff G1 parity, S8 binding spec, per-phase GO/NO-GO gates, M2 partial-flip abort, G3b evidence-of-record) is held-for-operator-push per operator UID3282, not for an autonomous public PR. No content lost; deliverable stands as done+held. Sorry for the noise.

@frstrtr frstrtr closed this Jul 3, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant