Purpose: consolidate everything the project knows about legal ability to run 5.8 GHz over-the-air (OTA) mesh experiments. Previously scattered across three docs; consolidated per W7 finding #6.
Date of this snapshot: 2026-07-05, measured on main @ 13e4692.
Do not treat this document as legal advice. It is a status board for internal go/no-go decisions. Actual OTA experiments require a licensed operator and, in most jurisdictions, written authorization filed with the regulator.
| Jurisdiction | 5.8 GHz OTA status for mesh | Power ceiling (unlicensed) | Path to licensed test | Next-step date | Source |
|---|---|---|---|---|---|
| Thailand (Phuket, primary dev location) | CLOSED for mesh use without NBTC license | 100 mW EIRP under Wi-Fi-like rules; mesh routing not covered | Requires NBTC individual radio license; no application filed | n.a. — blocked | docs/WAVE_REPORT_2026-07-03.md:145 |
| Singapore | Similar to TH — licensed-by-rule 100 mW ceiling for point-to-point | 100 mW | IMDA test license process (~4-8 weeks) | not initiated | docs/STRENGTHEN.md P8 BVLOS row |
| UAE (ADGM / DIFC via Hub71+) | OPEN in principle via ADGM / DIFC RegLab sandbox | Case-by-case per sandbox admission | Hub71+ AI Cohort 20 application (deadline 2026-08-02) is prerequisite step | 2026-08-02 (application deadline) | README.md:169; docs/LOCAL_FLASH.md:413 |
| USA (FCC, hypothetical) | 5.725-5.850 GHz U-NII-3 unlicensed; mesh permitted with 802.11 rules | 1 W conducted / 4 W EIRP with cert | Would require FCC Part 15 subpart E cert for radio module | not on roadmap | n.a. — not the target market |
| EU (CEPT, hypothetical) | 5.725-5.875 GHz ISM; mesh permitted with SRD rules | 25-500 mW depending on band segment | ETSI EN 300 440 / EN 302 502 conformance | not on roadmap | n.a. — not the target market |
-
Digital loopback: AD9361 internal TX→RX digital path. Already done, SNR 108.6 dB (
radio/README.md:7-14). Note: this is not an over-the-air measurement, see W7 finding #5. -
SMA RF loopback with attenuator: TX SMA → attenuator → RX SMA, contained inside the lab. No radiation. Listed as "next (still greenfield)" in
radio/README.md:26-29; the physically-next legal experiment. Planned indocs/LOCAL_FLASH.md §9.3. -
UDP transport dev (current): mesh routing logic (
trios_meshd) runs on loopback UDP without touching the radio front-end. This is what M2 gate v2 tests. Legal everywhere.
- Any 5.8 GHz radiated experiment in Thailand. No route to legal until NBTC license or Hub71+ ADGM sandbox admission.
- Field flight tests with mesh in the air. Requires both spectrum authorization AND drone flight authorization (separate BVLOS process; see
docs/STRENGTHEN.mdP8 row). - Public claims of "5.8 GHz mesh works" based on digital loopback numbers. See W7 finding #5.
If Hub71+ 2026-08-02 application is not admitted:
- Fallback A: apply to IMDA (Singapore) sandbox — precedent for DePIN radio experiments exists.
- Fallback B: partnership with an existing licensed operator (defense contractor, university) — no candidate identified as of 2026-07-05.
- Fallback C: keep radio arm at digital + SMA loopback, ship remaining stack (T27 codegen, FPGA attestation, token protocol) which do not require spectrum.
- Finding W7 #6 — this file addresses that finding.
docs/LOCAL_FLASH.md— hardware handling procedures.docs/BENCHMARK_VS_MANET_2026-07-04.md— regulatory row in the boundary table.README.md— hardware matrix; this document should be linked next to the matrix.