Skip to content

📋 Execution Plan 2026-07-11 · consolidated merge-order (5 waves -> one ordered plan; #60 unblocks all) #74

Description

@gHashTag

Consolidated Execution Plan — 2026-07-11 (merge-order, not a new audit)

The five audit waves (PRs #59, #67, #69, #71, #73 / issues #58, #66, #68, #70, #72) are now synthesized into one dependency-ordered execution plan: docs/EXECUTION_PLAN_2026-07-11.md (branch feat/execution-plan-2026-07-11, draft PR linked below).

The single bottleneck (verified from git this session)

main does not build from a clean clone — fails in build.rs:29-30 (E0308 + E0599, 4 errors) before the library/gen/rust is reached. Ground-truth: 68 specs, 101 tests.

Nothing downstream is verifiable or regenerable until PR #60 merges. Every P1/P2 fix is spec-first with an executed cargo test acceptance criterion; none can run on a red tree.

Plan shape

Synthesis/planning only — no code edited, no merge, no hardware, no fabricated metrics.

phi^2 + phi^-2 = 3

Metadata

Metadata

Assignees

No one assigned

    Labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions