Skip to content

📋 docs: consolidated execution plan 2026-07-11 (merge-order synthesis of 5 waves)#75

Draft
gHashTag wants to merge 1 commit into
mainfrom
feat/execution-plan-2026-07-11
Draft

📋 docs: consolidated execution plan 2026-07-11 (merge-order synthesis of 5 waves)#75
gHashTag wants to merge 1 commit into
mainfrom
feat/execution-plan-2026-07-11

Conversation

@gHashTag

Copy link
Copy Markdown
Owner

Draft — do not auto-merge (human-only per docs/AUTONOMOUS.md). Tracks #74.

What this PR adds

docs/EXECUTION_PLAN_2026-07-11.md — a single dependency-ordered execution plan synthesizing the five prior audit waves (#59, #67, #69, #71, #73). Not a new audit: every finding is cited to the wave that filed it. No spec/code changed.

Honesty preface (verified from git this session)

  • main red: cargo build fails in build.rs:29-30 (E0308 + E0599, 4 errors), before the library/gen/rust.
  • Ground-truth counts: 68 .t27 specs, 101 #[test].
  • Upstream compile dependency re-checked: t27#1401 CLOSED (in the pinned t27c), t27#1456 OPEN, t27#1457 OPEN.

The single bottleneck

main does not build → PR #60 must merge first. Until then nothing downstream is verifiable or regenerable.

Contents

  1. Bottleneck stated up front + leverage argument for build(pipeline): pinned-t27c gen/rust + physical drift-guard (запрет писать в репо неправильно) #60.
  2. Dependency-ordered plan — Step 0 (merge build(pipeline): pinned-t27c gen/rust + physical drift-guard (запрет писать в репо неправильно) #60, close 🌊 Wave 2026-07-10 · fix(build): зелёная библиотека + отчёт волны (closes-partial #58) #59 superseded, t27#1456/#1457 gate for the 8/9 inert modules); Step 1 (all 5 P1s spec-first, ordered by attack-relevance, each with .t27 + acceptance test + effort); Step 2 (P2 hardening groups A–F).
  3. Findings → 4-sprint map (identity+integrity / path-diversity+self-heal / hardening / verification-parity), E-ids + dependencies.
  4. Three cooperation lanes, framed as executable next steps once build(pipeline): pinned-t27c gen/rust + physical drift-guard (запрет писать в репо неправильно) #60 lands.
  5. Competitor note (Electronics 15(4):785, Feb 2026).

Boundary

Synthesis only — no merge, no push to main, no hardware, no fabricated metrics. Does not rewrite docs/archive/STRENGTHEN.md. Agent proposes; a human merges.

phi^2 + phi^-2 = 3

Co-Authored-By: Claude Fable 5 noreply@anthropic.com

…f 5 audit waves)

Synthesizes PRs #59/#67/#69/#71/#73 into one dependency-ordered plan.
Single bottleneck: main red at build.rs -> PR #60 merges first.
Step 1 = all 5 P1s spec-first by attack-relevance; Step 2 = P2 groups;
findings->4-sprint map; 3 cooperation lanes; competitor note.
Not a new audit. main-red verified from git this session.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@gHashTag

Copy link
Copy Markdown
Owner Author

Triage — KEEP

Verdict from cascade analysis: KEEP, awaiting caskade merge.

Root cause of red CI (build + test (-sim baseline)): committed gen/rust/ on feature branches with expanded module set contains E0425 defects from three optimizer scan bugs in t27c (const_propagate, copy_propagate, dead_store_elim not recursing into control-flow bodies). Not a defect in this PR — this PR is docs-only and has no code paths affected.

Cascade to unblock (all three DRAFT):

  1. t27#1461 — mut-inference (base t27/master)
  2. t27#1462 — recursive optimizer scan (stacked on #1461), verified −182 errors cross-env (linux sandbox 28 / macOS arm64 26, ±2 epsilon)
  3. tri-net#80 — regen gen/rust/ on feat branches with new t27c

Once #80 lands, baseline CI on this PR goes green automatically. No action required on this PR — it stays DRAFT until human merge.

Realm-check discipline: numbers above measured on commit SHA bbaaa4a1 in t27, cargo check --lib grep count ^error\[E. Not fabricated.

phi^2 + phi^-2 = 3

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants