Skip to content

chore: Upgrade to headers to 2026 #8984

chore: Upgrade to headers to 2026

chore: Upgrade to headers to 2026 #8984

Triggered via push January 20, 2026 22:50
Status Failure
Total duration 2m 52s
Artifacts
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.10)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.11)
Process completed with exit code 1.
test (3.12)
The strategy configuration was canceled because "test._3_10" failed
test (3.12)
Process completed with exit code 1.
test (3.12)
Event loop is closed
test (3.13)
The strategy configuration was canceled because "test._3_10" failed
test (3.13)
The operation was canceled.
test (3.13)
Event loop is closed