Skip to content

integration

integration #1068

Triggered via schedule July 18, 2025 09:05
Status Failure
Total duration 26s
Artifacts

integration.yml

on: schedule
Matrix: checks
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
checks (ruffformatcheck)
Process completed with exit code 1.
checks (build-check)
The operation was canceled.
checks (build-check)
The strategy configuration was canceled because "checks.ruffformatcheck" failed
checks (doc8)
The operation was canceled.
checks (doc8)
The strategy configuration was canceled because "checks.ruffformatcheck" failed
checks (rstcheck)
The operation was canceled.
checks (rstcheck)
The strategy configuration was canceled because "checks.ruffformatcheck" failed
checks (docs)
The operation was canceled.
checks (docs)
The strategy configuration was canceled because "checks.ruffformatcheck" failed