Skip to content

report errors

report errors #72

Triggered via push September 30, 2025 12:24
Status Cancelled
Total duration 2m 14s
Artifacts

ci-build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

12 errors
build (3.9)
Process completed with exit code 1.
build (3.11)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_9" failed
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_9" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.13)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_9" failed
Build unstable
The run was canceled by @lfoppiano.