Skip to content

Upgrade build to 4.0.0 #910

Upgrade build to 4.0.0

Upgrade build to 4.0.0 #910

Re-run triggered October 9, 2025 05:27
Status Failure
Total duration 2m 13s
Artifacts

check_pr.yml

on: pull_request
Matrix: analyze
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (beta)
Process completed with exit code 1.
build (stable)
The operation was canceled.
build (stable)
The strategy configuration was canceled because "build.beta" failed