Skip to content

ci: enable manual triggering of release workflow (#15) #20

ci: enable manual triggering of release workflow (#15)

ci: enable manual triggering of release workflow (#15) #20

Triggered via push November 24, 2025 01:39
Status Failure
Total duration 45s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (20.x)
Process completed with exit code 1.
build (20.x)
mizzle-orm#test: command (/home/runner/work/mizzle-orm/mizzle-orm/packages/mizzle-orm) /home/runner/setup-pnpm/node_modules/.bin/pnpm run test exited (1)
build (18.x)
The strategy configuration was canceled because "build._20_x" failed
build (18.x)
The operation was canceled.
build (18.x)
mizzle-orm#test: command (/home/runner/work/mizzle-orm/mizzle-orm/packages/mizzle-orm) /home/runner/setup-pnpm/node_modules/.bin/pnpm run test exited (1)