Commit 3924943
authored
docs(README): add Runtime section — wall-clock + cost per VISUAL level (#113)
Surface the end-to-end runtime for VISUAL=0/1/2 measured on a 2021 M1
Max, with an Approx cost column (VISUAL=0 ≈ $0.05; V1/V2 pending
measurement) and a note that cost scales with model usage, not wall
clock.1 parent db3298e commit 3924943
1 file changed
Lines changed: 14 additions & 0 deletions
| Original file line number | Diff line number | Diff line change | |
|---|---|---|---|
| |||
119 | 119 | | |
120 | 120 | | |
121 | 121 | | |
| 122 | + | |
| 123 | + | |
| 124 | + | |
| 125 | + | |
| 126 | + | |
| 127 | + | |
| 128 | + | |
| 129 | + | |
| 130 | + | |
| 131 | + | |
| 132 | + | |
| 133 | + | |
| 134 | + | |
| 135 | + | |
122 | 136 | | |
123 | 137 | | |
124 | 138 | | |
| |||
0 commit comments